![Celikel CHARGER V 20 Operator'S Instruction Manual Download Page 14](http://html1.mh-extra.com/html/celikel/charger-v-20/charger-v-20_operators-instruction-manual_2580225014.webp)
FOR TRAILER TYPE MODELS
WARNING:
Make sure the no one area around the tractor and machine
-
Run the tractor and moving back to machine’s drawbar.
-
Gently pull the drawbar to connect machine to tractor.
-
Switch off the tractor and check the drawbar of machine.
-
Make the propeller shaft connection.
WARNING:
The running of the propeller shaft length is appropriate and to make sure that
the housing situation.
-
You must secure the propeller shaft housing chain.
-
Be sure to close the propeller shaft lock.
-
Connect the power cord to the weighing system tractor's battery.
-
Make hydraulic connections. (For models without hydraulic pump)
-
To switch the road transport position please lift the machine foot.
WARNING:
Be sure that all connection cables mounted safely. To make safer and faster
connection you can make socket at the rear of the tractor.
FOR HANGING TYPE MODELS
WARNING:
Make sure the no one area around the tractor and machine.
-
Run the tractor and moving back to machine’s drawbar
-
Switch off the tractor and attaching the machine with three point linkage to tractor.
-
Make the propeller shaft connection.
WARNING:
The running of the propeller shaft length is appropriate and to make sure that
the housing situation.
-
You must secure the propeller shaft housing chain.
-
Be sure to close the propeller shaft lock.
-
Make hydraulic connections. (For only 1,5 m³ PTO type )
ADJUSTMENT THE LENGHT OF SHAFT
The length of the connection must be measured before the propeller shaft. If needed, it is
necessary to set the propeller shaft length. These operations are described below.
-
PTO shaft length is measured. (The distance between the tractor PTO and the machine
shaft) and is set to be cut off excess.
-
Chain on the propeller shaft is removed.