background image

11.

- To set Alarm1 percentage

Example:-

12.

- To set Alarm2 percentage

Example:-

12.

- To set Trip percentage

Example:-

13.

- To Test outputs

14.

- To set Integration

,

15.

- To Manipulating Error

,

Note:-

 

 

 

 

 

 

 

 

Again press

key, Display shows

,

.

Again press

key, Display shows

, it is the percentage value of running demand period at which Alarm2 will

be on full normal period.

.

Again press

key, Display shows

, it is the percentage value of running demand period at which Trip will

be on full normal period.

.

Again press

key, Display shows

Use

key, Display show

and AL1 LED glows, and Alarm1 on in 10 seconds.

Again press

key, Display show

and AL2 LED glows, Alarm2 on in 10 seconds.

Again press

key, Display show

and Trip LED glows, Trip on in 5 seconds.

Again press

key, Display shows

it should be equal to energy meter.

Again press

key, Display shows

This feature is for matching controller kW with energy meter kW and

hence RD running demand will match automatically.

= 100 - actual controller calibration

= 110 - 10% addition to the actual controller calibration

= 90

- 10% below actual controller calibration

Measurement should be stimulation from controller and energy meter for matching.

 

 

 

 

 

 

 

 

 

 

Alarm1 energizes when kW More than Set MD.

If user set target demand at 160 kW and AL1 is at 110

Then over load limit will be 160x110/100 = 176 kW

As the running load exceeds 176 Alarm1 will be ON.

If user set target demand at 160 kW and AL2 is at 95

There limit for Alarm2 will be 160x95/100 = 152 kW

As Rising Demand (RD) reaching 152 Alarm2 will be ON.

If user set target demand at 160 kW and Trip is at 100

There limit for Alarm2 will be 160x100/100 = 160 kW

As Rising Demand (RD) reaching 160 Trip will be working 5 seconds.

Use

and

keys to set Alarm1 value.

Use

and

keys to set Alarm2 value.

Use

and

keys to set Trip value.

Use

and

keys to set integration time 15 and 30 minutes.

Suit the Integration time equal to energy meter Integration time usual it is 30 minutes

Use

and

keys to increase and decrease value.

User Manual

MDI-CONTROLLER

98MDC

5

Summary of Contents for 98MDC

Page 1: ...nenvironmental conditionsother than thosespecified inthis manual 2 Fuse protection The equipment does not contain built in fuse Installation of external fuse for electrical circuitry is highly recommended Recommended rating ofsuchfuse shall be275VAC 1A 3 Since this is a built in type equipment finds place in main control panel its output terminals get connected to host equipment Such equipment sha...

Page 2: ... show Present DATE MM DAY 6 MD LED Indicate Display 2 show Target demand of present Time Tarif Maximum Demand Indication 7 KVA LED Indicate display 2 shows Instantaneous KVA Apparent power 8 Time LED indicate Display 2 shows Present time 24 Hour Format 9 Peak Time LED indicate Display show present Peak Load Start Timer 10 PROG LED indicate the system is in programming mode 11 PKL ON LED Indicate s...

Page 3: ...nd can be set as per set customer requirement key Y phase LED glows and Display shows Y phase kW kVA Again Press key B phase LED glows and Display shows B phase kW kVA Press key display show Real Time Clock RTC and Date If Alarm1 or Alarm2 is energize Press key to reset both the Alarm Alarm1 and Alarm2 reset and Alarm1 and Alarm2 LED s are blinking in reset mode After to reset the alarm1 or Alarm2...

Page 4: ...in Press key Display shows power cut off day change the power cut Again Press key Display shows change CT Ratio Again press key Display shows Again press key Display shows denote peak time sanction load Again press key Display shows denote power cut sanction load display show internal clock time and Date operator can view the program If Display shows device is unlocked operator can modify the prog...

Page 5: ...g demand will match automatically 100 actual controller calibration 110 10 addition to the actual controller calibration 90 10 below actual controller calibration Measurement should be stimulation from controller and energy meter for matching Alarm1 energizes when kW More than Set MD If user set target demand at 160 kW and AL1 is at 110 Then over load limit will be 160x110 100 176 kW As the runnin...

Page 6: ...ber is 7 7 14 Use key and key to change the value If you can set value 15 then unlock number is 15 7 22 Again press key Display shows set the January peak load on time Use key and key to change the peak load time Use key to enter change HH MM Again press key Display shows set the January peak load off time Use key and key to change the peak load time Use key to enter change HH MM Again press key D...

Page 7: ...play shows set the April peak load off time Use key and key to change the peak load time Use key to enter change HH MM Again press key Display shows set the May peak load on time Use key and key to change the peak load time Use key to enter change HH MM Again press key Display shows set the May peak load off time Use key and key to change the peak load time Use key to enter change HH MM Again pres...

Page 8: ...ey Display shows set the September peak load off time Use key and key to change the peak load time Use key to enter change HH MM Again press key Display shows set the October peak load on time Use key and key to change the peak load time Use key to enter change HH MM Again press key Display shows set the October peak load off time Use key and key to change the peak load time Use key to enter chang...

Page 9: ...ss key Display shows Use key to enter change Again press key Display shows Again press key Display shows operator can view the clock and calender If Display shows device is unlocked operator can modify the clock and calender Use and keys to change the value when Display is equal to unlock Display shows clock and calender can be changed Use and keys to change the value Month Date Use and keys to ch...