CONTROLLER PROGRAMMING
1 Start Programming mode
2
/
- Lock and Unlock the program
3.
To set the power cut start time
4.
To set the power cut start day
To set the power cut
6
- To set the power cut off day
7.
To set CT Ratio
8.
To set Maximum Demand in normal period
9.
- To set Maximum Demand in peak load period
10.
To set Maximum Demand in power cut period
.
Press
key,
Press
key, Peak time LED glows and Display shows Peak load On/Off period for present
month.
.
Again press
key, if Display shows
,device is locked but
-
Again Press
key, Display shows
- power cut start time.
change the power cut start time.
Use
key to enter change HH : MM.
-
Again Press
key, Display shows
- power cut start day.
change the power cut start
Again Press
key, Display shows
- power cut off time.
change the power cut
time.
Use
key to enter change HH : MM
.
Again Press
key, Display shows
- power cut off day.
change the power cut
-
Again Press
key, Display shows
change CT Ratio.
-
Again press
key, Display shows
Again press
key, Display shows
denote peak time sanction load.
-
Again press
key, Display shows
denote power cut sanction load.
display show internal clock time and Date.
operator can view the program.
If Display shows
, device is unlocked operator can modify the program.
Use
and
keys to change the value, when Display is equal to unlock PROG. LED
glows and Display shows
, program can be changed.
Use
and
keys to
Use
and
keys to
day.
Use
and
keys to
off
Use
and
keys to
off day.
Use
and
keys to
Use
and
keys to set maximum demand at normal time.
Use
and
keys to set maximum demand at peak time.
Use
and
keys to set maximum demand at power cut.
*
Unlock Number is program value of program (
) +7
*1-Monday, 2-Tuesday, 3-Wednesday, 4-Thursday, 5-Friday, 6-Saturday, 7-Sunday
* 1-Monday, 2-Tuesday, 3-Wednesday, 4-Thursday, 5-Friday, 6-Saturday, 7-Sunday
5.
-
off time
User Manual
MDI-CONTROLLER
98MDC
4