CPR3 Relay - rev.1 

 

DATE: 11/06/13     Pag. 1 of 3 

 

 

INSTALLATION, OPERATION AND MAINTENANCE GUIDE 

PROTECTIVE RELAY 

CPR3

 FOR RUBBER BAG CONSERVATOR 

 

 

 

STORAGE AND SHELF LIFE 
 

Handle  with  care.  Max  storage  period  before  putting  the  instrument  into  operation  is  5  years 
(temperature -20 +50 °C – air humidity 50-75 %) as long as the instrument is kept in its envelope 
and in a clean place. Before use, visual check that no damages happened to any parts. 

 
UNPACKING 

 

Unpack the CPR3 from its carton box, pull it out from the plastic bag and remove the plastic plug 
under bottom flange. Before use visual check that no damages happened to any parts. 
Make a correct disposal of packaging according local regulations. 

 
MOUNTING POSITION 
 

According to your arrangements the protective relay CPR3 can be mounted top of conservator top 
of  conservator  (see  alternative  1  in  mounting  sketch  in  dwg.3678)  or  top  of  a  piping  coming  off 
conservator  from  front  wall  (see  alternative  2  mounting  sketch  in  dwg.3678)  using  4  screws, 
washers and nuts M10. Sealing is obtained using a flat gasket made in NBR (standard material). 

 

SETTING TO WORK 
 

Before  setting to  work fill  up  the  relay  with  insulation  oil making  sure  that  air  inside  the body  has 
been released through gas release cock pos.2. 
To  do  this  operation  cover  the  top  cock  with  a  cloth  (to  avoid  oil  spraying)  open  the  cock  pos.2 
acting the side handle and wait until oil leaks off. After the oil spurges off the cock close the handle. 
Make  wiring  according  to  provided  wiring  diagram  and  take  out  the  wires  through  cable  entry 
according your arrangements. 
Electrical circuit can now be manually tested by pressing down the push button pos.3. 
 

TESTING OF CONTACT 

 
The  relay  is provided  with  a  self resetting  push-button for checking  the continuity  of  the  electrical 
circuits. 
The  procedure  for  testing  is  very  simple:  unscrew  the  knurled  cap  pos.3  (see  drawing)  which 
protect the push-button and press it slowly in order to activate the alarm contact and after the trip 
contact.  When  the  push-button  end  his  stroke,  release  it  slowly,  in  order  to  switch  off  the  alarm 
contact. 
During testing it is possible to observe the movement of the float through the inspection window. 
 

Test of alarm contact at ground level 

 
When  at  site,  without  needing  to  climb  up  top  of  conservator,  you  can  test  the  contact  function 
inflating  gas  through  a  piping  connected  to  gas  release  cock  pos.2.  Arrange  for  a  copper  tube 
coming down from gas cock to ground level where a cock / ball-valve shall be fitted as shown in the 
sketches in the following page. 