background image

2

MATERIALS REQUIRED:

TOOLS YOU NEED:

 

ASSEMBLY INSTRUCTIONS:

12 foundation or concrete foundation pads

ASSISTANCE  REQUIRED:

A minimum of two people will be required to construct the Garden Shed, 

a third person will be helpful when working on the roof structure.

Assembly of building will require the use of power tools and a ladder. Please take precautions at all times.
Obtaining necessary permits is the sole responsibilty of the purchaser.

Please visit our website at www.cedarshed.com for additional safety tips and other considerations to

promote safe and enjoyable usage of your Cedarshed Product for years to come.

NOTE

Garden tools for foundation leveling work

Power drill & drill bits

4 Step ladders (8' Min.)
36" carpenters Level

Hammer, saw, tape measure, pencil etc.

1

16

" drill bit

'The 12 x 4 Bayside'

B124

1 tube of outdoor rated latex caulking

1.  Foundation Preparation......................page...7 to 8

2.  Floor Assembly...................................page...9 to 12
3.  Wall Assembly....................................page...13 to 16
4.  Roof Assembly....................................page...17 to 18
5. Trim......................................................page...19 to 23
6. Hardware..............................................page...24 to 26

Issue 01 1-Mar-22

Summary of Contents for B124

Page 1: ...ou with years of enjoyment When exposed to the elements natural unfinished Western Red Cedar will weather to a beautiful silvery grey If you prefer to maintain the natural wood colors ask your Authorized Cedarshed Dealer to recommend a quality stain to apply after assembly Cedarshed Industries The 12ft x 4ft Bayside B124 Issue 01 1 Mar 22 ...

Page 2: ...ilty of the purchaser Please visit our website at www cedarshed com for additional safety tips and other considerations to promote safe and enjoyable usage of your Cedarshed Product for years to come NOTE Garden tools for foundation leveling work Power drill drill bits 4 Step ladders 8 Min 36 carpenters Level Hammer saw tape measure pencil etc 1 16 drill bit The 12 x 4 Bayside B124 1 tube of outdo...

Page 3: ...ded by If the structure is elevated above ground local Building Code requirements are solely the owners responsibility and snow off the roof Roof Snow Load Ratings vary by geographical location If a heavy or wet snowfall occurs it is advisable to clear the Some Safety Tips to Consider Include reference for future maintenance residential use Please follow the Assembly Manual when building the struc...

Page 4: ... P 2346G Header P 2346G Header P 2346G Header P 2346G Gabel Panel GW 008 Gabel Fascia P 1445Yg Gabel Panel GW 008 Gabel Fascia P 1445Yg Header P 2346G Header P 2346G Door Frame DF 006 Fascia P 1424 Fascia P 1446G Fascia P 1442 Infill Wall IW 001 Infill Wall IW 001 Infill Wall IW 001 Top Plate P 2341G Roof Panel C RF 019 Roof Panel C RF 018 Roof Panel C RF 032 Roof Panel C RF 019 Top Skirting P B G...

Page 5: ...edarshed Product is constructed of Western Red Cedar Exterior Wall and Roof framing is 2 x 3 SPF Floor is 2 x 4 Cedar with 5 8 plywood A C B SIDE VIEW D Area 46 5 Sq Ft 144 31 1 16 x 71 3 4 46 1 2 Specifications for The 12 x 4 Bayside B124 1018 lbs 84 94 3 4 Issue 01 1 Mar 22 D ...

Page 6: ...S DOOR HARDWARE B124 Barrel bolt To confirm you have received all materials sort them according to this list Call or e mail us if you are missing any items and we will courier or ship as soon as possible Toll Free Customer Support Line 1 800 830 8033 E mail sales cedarshed com Protect your building materials from wet weather by covering them when necessary 3 Green Brown screws for floor joist Bag ...

Page 7: ...rea Remove all debris roots grass rocks etc Make sure the ground slopes away from the site at least 10 feet in all directions If necessary build up the soil in the center of the site and slope away from the high point to provide drainage Fill in any low spots within the perimeter of the site GRADE A SLOPE OF 1 8 PER FOOT enough to prevent water accumulation We recommend excavating the site 4 deep ...

Page 8: ...t Foundation Plan Concrete Patio Stone Foundation Option 1 12 x 12 305 x 305 Metric Dimensions shown in brackets Foundation Preparation B124 Floor Joist System Concrete Slab Foundation Option 2 46 1 2 x 144 1 2 1181 x 3670 Under Floor Joist System ...

Page 9: ...een B124 Floor Assembly Issue 01 1 Mar 22 P 2443G P 2446G Part Number Description Size or Type of Pcs CODE FLOOR PARTS P 2423 Floor Joist 2 x 4 x 23 4 P 2423 P 2443G 2 x 4 x 43 1 2 4 P 2443G P 2446G 2 x 4 x 46 1 2 6 P 2446G P 2469 2 x 4 x 69 4 P 2469 P PL I2446G Plywood Sheet 5 8 x 24 x 46 1 2 3 P PL I2446G P PL I2646G Plywood Sheet 5 8 x 26 x 46 1 2 1 P PL I2646G P PL I46G46G Plywood Sheet 5 8 x ...

Page 10: ...sing 2 3 screws per joist Assembly the joist box together as per Fig P 10 2 The completed joist box is pictured in Fig P10 3 46 1 2 x 26 Joist Box P10 FIG P10 1 10 FIG P10 3 FIG P10 2 3 Screw Can Be Brown Green B124 Floor Assembly Issue 01 1 Mar 22 P 2423 P 2446G ...

Page 11: ...sing 2 3 screws per joist Assembly the joist box together as per Fig P 11 2 The completed joist box is pictured in Fig P11 3 72 x 46 1 2 Joist Box P11 FIG P11 1 11 FIG P11 3 FIG P11 2 3 Screw Can Be Brown Green B124 Floor Assembly Issue 01 1 Mar 22 P 2469 P 2446G ...

Page 12: ...FIG F 4 FIG F 2 B124 Floor Assembly FIG F 1 Affix the plywood panels as per Fig F 3 using 2 screws on 12 centers and affixing the plywood to each row of joist The finished floor is shown in Fig F 4 P11 P9 P PL I2446G 3 24x46 1 2 Plywood P PL I46G46G 1 46 1 2x46 1 2 Plywood P PL I2646G 1 26x46 1 2 Plywood Issue 01 1 Mar 22 P10 ...

Page 13: ...Headers to the Wall Panels with 3 screws Make sure Base Plate of Wall Panel is flush with Floor Boards B124 BW 003 Siding must not be sitting on the floor panel it should be on the outside as shown Wall panel frame must be flush with floor panel 3 screws between wall studs DF 006 P 2346G Issue 01 1 Mar 22 P 2346G Part Number Description Size or Type of Pcs CODE WALL PARTS AND PANELS BW 003 Solid W...

Page 14: ...all panel 5 3 screws alternating from both sides Continue installing all panels except for the door panel using 5 3 screws to attach each of the panels together and 3 3 screws to attach to the floor B124 5 3 screws Screw pattern wall to wall and to floor Issue 01 1 Mar 22 ...

Page 15: ... need to be mounted Make sure there is an 1 8 3mm gap at the top of the door middle and of the non hinge vertical edge of the door See Figure 8 below for details These gaps will allow the door to open freely Use the 1 16 drill bit to pre drill the holes before installing the hinges B124 Fasten the hinges as shown with black screws supplied Door Frame DF 006 Issue 01 1 Mar 22 ...

Page 16: ...rews to attach gable and infill walls together at each joint and use 3 3 screws to attach each gable and infill wall to top of the walls 3 screws at 16 centers Attach the Roof Gables and Infill Walls with 18 3 screws B124 P 2346G P 2346G P 2371K P 2371K P 2341G P 2341G GW 008 GW 008 IW 001 IW 001 Issue 01 1 Mar 22 Part Number Description Size or Type of Pcs CODE P 2371K Top plate 2 x 3 x 71 3 4 2 ...

Page 17: ...ve between rafters and on seat cut to top plate Secure the roof panel using 3 screws as shown 2x3 Roof rafter 1x3 Top plate 2x3 Wall header 2x3 Wall stud Cedar bevel siding 3 long screw at each center rafter at an angle through 2x3 header and into rafter FIGURE S15 Using 3 screws affix the roof rafters to the top plates of the front and back walls See Figure S18 FIGURE S13 C RF 019 C RF 032 2x3 Ro...

Page 18: ...nder each row of cedar shingles up the full length of the Roof Joint Seam When complete take the Metal Flashing Shingles and slide them one by one between the rows of Cedar Shingles along the Roof Panels Joints FIGURE S15 B124 H M FLASS H M FLASS Issue 01 1 Mar 22 ...

Page 19: ... SOAK IN UNDER THE TRIM BOARDS 4 Here is the order they should be applied Depending on the choice of the door location there may be some trimming of the trim boards required Altering trim boards if door is on the 4 ft 1219mm narrow side of the high wide side of the shed 5 1 1 x 2 x 87 1 2 P 1287G trim board needs to be cut to 1 80 1 2 P 1280G and 1 10 1 2 pieces The 80 1 2 P 1280G trim will be use...

Page 20: ...rough the bottom of the skirting piece as shown on diagram C Slide in the skirting behind the bevel siding as shown on diagram B Pry the last horizontal bevel siding piece on the bottom of the gable panel slightly Do not use too much force or the bevel siding will break Bevel siding Skirting Nails 20 B124 Installing the Top Skirting at Gable and High Wall Panels ...

Page 21: ...he center of each soffit attach the soffit to the underside of the rafter ends For details refer to Figure S20 below FIGURE S17 Soffits P G437 B124 P G424 Part Number Description Size or Type of Pcs CODE P B G446G Soffit x 4 x 46 1 2 1 P B G446G P G424 Soffit 1 P G242 x 4 x 24 SOFFITS Issue 01 1 Mar 22 P G437 Soffit x 4 x 37 2 P G437 P B G446G P B G437 ...

Page 22: ... FIGURE 18 FIGURE S18 FIGURE S19 Top and Bottom Skirting P B G645 x3 P B G445 x3 22 B124 Part Number Description Size or Type of Pcs CODE P B G645 Skirting 1 2 x 6 x 45 12 P B G645 P B G445 3 Skirting 1 2 x 4 x 45 P B G445 SKIRTING P B 14B48 Issue 01 1 Mar 22 P B G645 P B G645 P B G645 P B 14B48 Door Skirting 1 x 4 1 8 x 48 1 P B 14B48 P B G445 P B G645 x3 ...

Page 23: ... L R 1 x 4 x 42 1 x 4 x 24 1 x 4 x 55 4 2 2 Issue 01 1 Mar 22 P 1289G Trim long 1 x 2 x 89 1 2 4 P 13C79C 1 x 3 1 4 x 79 1 4 2 Trim short P 1280G 1 x 2 x 80 1 2 3 Trim short P 11K79C Trim short 1 x 1 3 4 x 79 1 4 1 P 13C89G 1 x 3 1 4 x 89 1 2 2 Trim long P 1446G Fascia 1 x 4 x 46 1 2 2 P 1442 P 1424 P 1455Yg P 1289G P 13C79C P 1280G P 11K79C P 13C89G P 1446G P 1424 P 1442 P 1455Yg P 1280G P 11K79C...

Page 24: ...e handles and hasp using 1 16 drill bit 24 Door Hardware Installation FIGURE S22 B124 P H DHAND Handle P H HASP Hasp OUTSIDE VIEW Not exactly as shown Issue 01 1 Mar 22 P H BBL4 Barrel Bolt DR 003 Dutch Door INSIDE VIEW P H BBL4 Barrel Bolt ...

Page 25: ...h plaque with finishing nails Rectangle shape plaques is attached to front fascia See Figure S24 B124 2 finishing nails Cedarshed plaque Front fascia FIGURE S24 H PLAQL Cedarshed Industries Plaque Installation ...

Page 26: ...our finished Cedarshed product we will send you a personalized plaque free of charge that you can mount on your building max 36 letters Don t forget to enter our Best Picture Contest Refer to Questionaire for details Please refer to the questionnaire or call Cedarshed if you require additional information TOLL FREE CUSTOMER SUPPORT 1 800 830 8033 e Mail sales cedarshed com Visit our Website www ce...

Reviews: