1 x
Board Access FSC 1 x 4 x 20-1/2”
1 x
Rock Bottom FSC 1 x 6 x 20-1/2”
3 x
Rock Board A FSC 1 x 6 x 20-1/2”
3 x
Rock Board B FSC 1 x 6 x 20-1/2”
Step 3: Rockwall Assembly
Part 1
Fig. 3.3
Wood Parts
Hardware
Other Parts
1 x EN71 Hand Rail
030
033
032
031
A:
Place (030) Board Access at top of the Access Ladder/Rockwall Assembly and (031) Rock Bottom at the
bottom of the assembly as shown in fig. 3.1. Then place (032) Rock Board A, (033) Rock Board B, (034) Rock
Board C and (035) Rock Board D as shown in fig. 3.1. Do not screw boards down yet. Rock holes are to be
staggered so they do not form a straight line and are at the top of the boards.
Note: Rock Boards are to be
flush to (021) Right Access Rail and pilot holes are centred over (024) Rock Rail. (fig. 3.1)
B:
Make sure all boards fit together snugly and the assembly is square, then attach (030) Board Access and
(031) Rock Bottom using 4 (S20) #8 x 1-3/8” Wood Screws per board. (fig. 3.1)
C:
Fasten all the other boards with 4 (S20) #8 x 1-3/8” Wood Screws per board. (fig. 3.1)
D:
Place EN71 Hand Rail 1” from front edge of (025) Top Ladder and on (020) Left Access Rail.
Pre-drill holes
using a 3/16” drill bit
then attach EN71 Hand Rail using 2 (WL3) 1/4 x 1-3/8” Wafer Lags (with flat washer). (fig.
3.2 and 3.3)
48 x
#8 x 1-3/8” Wood Screw
2 x
1/4 x 1-3/8” Wafer Lag
(1/4” flat washer)
WL3
S20
033
020
Fig. 3.1
IMPORTANT!
Follow hole
pattern
WL3
030
025
1/4” Flat
Washer
EN71
Hand Rail
1/4” Flat
Washer
WL3
020
Fig. 3.2
032
033
035
034
032
033
035
034
032
031
EN71
Hand Rail
EN71
Hand Rail
025
2 x
Rock Board C FSC 1 x 4 x 20-1/2”
2 x
Rock Board D FSC 1 x 6 x 20-1/2”
034
035
S20
x 4 per
board
020
021
024
1”
27