R5"
Step 27: Swing Beam Assembly
Hardware
A:
Attach 6 Heavy Duty Swing Hangers to (270) Engineered SW Beam using 2 (G13) 5/16 x 6-1/8” Hex Bolt
(with 2 flat washers, plastic formed washer and lock nut) per swing hanger, as shown in fig. 27.1.
B:
Attach 1 Quick Clip to each Heavy Duty Swing Hanger. (fig. 27.2)
12 x
5/16 x 6-1/8” Hex Bolt
(5/16” flat washer x 2, 5/16” lock nut
& plastic formed washer)
4 x
5/16 x 3” Wafer Bolt
(5/16” flat washer, 5/16” t-nut)
Other Parts
6 x Heavy Duty Swing Hangers
6 x Quick Clips
WB7
G13
Wood Parts
1 x
Engineered SW Beam FSC 3 x 5-1/4 x 110”
270
C:
Install 4 (WB7) 5/16 x 3” Wafer Bolts (with flat washer and t-nut) in (270) Engineered SW Beam, as shown in
fig. 27.3 and 27.4. A Wafer Bolt does not get installed on the Swing Side of the beam.
IMPORTANT! MAKE SURE ALL 4 BOLTS ARE ATTACHED. THEY WILL MINIMIZE CHECKING OF WOOD.
R5"
Fig. 27.2
270
5/16” Flat
Washer
Fig. 27.1
Fig. 27.3
Fig. 27.4
G13
Plastic
Formed
Washer
5/16” Flat
Washer
5/16”
Lock Nut
Heavy Duty Swing Hanger
270
5/16” Flat
Washer
5/16” T-nut
WB7
Does not get
Wafer Bolt
Swing Side
Fort Side
9-3/4”
Notice this bolt is installed on the
opposite side of the other 3 bolts.
Quick Clip
101