10
SA5 OPERATIONS MANUAL & PARTS LIST
(Rev. 2/2020)
3.2 – INITIAL STARTUP
1. CLOSE AND SECURE ALL TANK SUCTION AND DISCHARGE PORTS.
2. YOU ARE REQUIRED TO SUPPLY AIR CONNECTIONS THAT FIT YOUR AIR
SYSTEM. THE SHARKS AIR-LINE TERMINATES IN ½” NPT PIPE THREAD.
THE SHARK REQUIRES A MINIMUM 3/8” DISCONNECT; (½” FOR OPTIMAL
PERFORMANCE). ¼” BLOW-OFF CONNECTIONS ARE TOO LIMITING ON
THE AIR SUPPLY REDUCING PERFORMANCE.
SUCTION
PORT
DISCHARGE
PORT