Cecilware ME10-GN Operation Manual Download Page 4

 

 
ASSEMBLY: The four legs and vent cap drain are packed separately with the water 
boiler. Install legs by tilting the water boiler on its side and screwing the legs into the 
leg supports until hand tight. Carefully right the unit and install in its permanent 
location, being sure to leave at least 6” on the right side of the water boiler for access 
to the control box. Level the unit by adjusting the bottom pad of the legs. Place the 
vent cap into the recess in the top of the unit. Mount the faucet assembly onto the 
shank in upright position. 

 
INSTALLATION AND OPERATING INSTRUCTION: 
 

PRE-INSTALLATION INSTRUCTIONS: The installation of your water boiler must be made 
by a licensed plumber and the installation must conform with State and Local Codes or 
in absence of Local Codes, with the National Fuel Gas Code ANSI Z223.1 a latest 
version. 
 
AIR SUPPLY AND VENTILATION: Adequate ventilation and air supply must be provided 
in order for the water boiler to operate properly and efficiently. The area in front of and 
above the unit must be clear to avoid any obstruction of flow of combustion and 
ventilation air. DO NOT under any circumstances, connect the water boiler flue directly 
to a building exhaust system or place the flue outlet directly into the plenum of the 
exhaust hood as it will adversely affect the gas combustion of the water boiler. 

 

CLEARANCES: Your water boiler is design certified to use on combustible floors. The 
side and back clearances for combustible constructions are as follows: 6 inches from 
side and 8 inches from back. The water boiler must be installed with 4 inch high legs 
provided. 
 
GAS CONNECTION: Before connecting the water boiler to the gas line Examine the gas 
specification label attached to the right side panel to be certain that the type of gas for 
which the unit is equipped is the same as the gas supply. A 3/8 NPT gas connection is 
needed to connect the unit to the gas line. An accessible manual shut-off valve must be 
installed in the gas supply line in case of an emergency. The gas supply pipe must be 
sized to accommodate all the gas fired equipment that may be connected to it. Check 
with your local Gas Company as to proper pipe size. Sealant on all pipe joints must be 
resistive to propane gas. Before attempting to light the water boiler, check all joints for 
gas tightness using a soap and water solution. 

 

WATER CONNECTION: The unit is supplied with ¼” flare fitting. Connect the copper 
tubing with the flare fitting to the water connection at the rear of the machine. The 
water line must have a shut-off valve (supplied by a plumber) to a cold water supply. 
Water pressure should be 20 lbs. minimum for proper operation. 
NOTE: Connecting the unit to a warm water supply will speed by heating and recovery 
time.  
To turn on the water supply valve plug the line cord into a dedicated 120V grounded 
receptacle (NEMA 5-15R). The water will start entering the unit and automatically fill it 
to capacity.   
 
PRIMING OR INITIAL FILLING: Turn on the water supply. The unit fills at the rate of 1 
gallon per minute. When the water level becomes visible in the sight gauge, turn the 
thermostat knob to the ON position. The boiler will now automatically fill to capacity 
and heat the water. 
 
LIGHTING AND ADJUSTMENT: Water must be visible in the sight glass before lighting to 
pilot. Turn the thermostat knob to its lowest position. Turn gas cock dial to PILOT 
position. Depress gas cock dial and light pilot with a long lighted match through the 
opening located on the bottom of the urn. Hold in depressed position for approximately 
30 sec. or until pilot remains lit when dial is released.   

Summary of Contents for ME10-GN

Page 1: ...peration Manual NQ24A 12 2006 CONTENTS Specifications Start up Instructions Trouble Shooting Guide Parts List Wiring Diagram 18 Gauge Type 304L Stainless Steel construction to resist corrosion Solid State water level control for automatic refill ...

Page 2: ...RATURE CONTROL NOTE UNIT IS SUPPLIED WITH A GROUNDED 120V 15A LINE CORD AND PLUG NEMA 5 15P PROPANE GAS BTU HR 10 W C 12 000 NATURAL GAS BTU HR 3 5 W C GAS SPECIFICATIONS 12 000 MODEL NO ME10 GN ME15 GN GENERAL SPECIFICATIONS ELECTRICAL SPECIFICATIONS A POWER SWITCH TEMPERATURE CONTROL GAS FLUE LINE CORD WITH PLUG GAS INLET 3 8 NPT 1 ...

Page 3: ... over the flue opening 4 Do not place combustibles or non combustible materials in the proximity of coffee urn as this could cause fires or obstruct air flow to the main burners 5 This installation must conform with local codes or in absence of local codes with the National Fuel Gas Code ANSI Z223 1 latest edition 6 Provide adequate air supply and ventilation 7 Provide adequate clearance for air o...

Page 4: ...ation label attached to the right side panel to be certain that the type of gas for which the unit is equipped is the same as the gas supply A 3 8 NPT gas connection is needed to connect the unit to the gas line An accessible manual shut off valve must be installed in the gas supply line in case of an emergency The gas supply pipe must be sized to accommodate all the gas fired equipment that may b...

Page 5: ... removal and cleaning FOR QUALIFIED SERVICE PERSONNEL ONLY THERMOSTAT CALIBRATION To adjust the temperature of the water in the urn turn the thermostat knob to 10 and remove the knob without moving the thermostat shaft Place narrow bladed screwdriver 1 8 into the hollow thermostat shaft and engage center adjustment screw When thermometer reading approaches 198F slowly turn the adjustment screw clo...

Page 6: ...g nut holding the burner to the frame Pull down the free burner end enough to clear the threaded stud and pull the burner horizontally away from the manifold orifice The burner can now be cleaned or replaced To reinstall reverse the above procedure BURNER MAITENANCE The burner should be cleaned both inside the venturi portion and on the outside using a soft bristle brush The burner must be replace...

Page 7: ......

Page 8: ......

Page 9: ... 25 K110A NUT 3 8 NPT CHROMIUM PLATED 1 1 26 K192A FITTING ALUMINUM INLET NATURAL GAS UNITS ONLY 1 1 27 K193A FTG 1 8 NPT x 1 4 ANGLE 1 1 28 K491A HOSE NUT ASSEMBLY AMERICAN THREADS 1 1 29 K525A 90 DEGREE ELBOW 1 2 TUBE 1 1 30 K549A FITTING ALUMINUM INLET LP UNITS ONLY 1 1 31 K635A ELBOW COMPRESSION FITTING 3 8 x 3 8 BRASS 2 2 32 K636A HEX REDUCING BUSHING 1 1 33 K810Q LEVEL SENSOR DUAL PROBE 1 1 ...

Page 10: ...t the terminals AC1 AC2 Your voltmeter should read 115 Volts It should read the same at terminals AC1 FILL when the water level is low This is the output power to actuate the coil of the Solenoid Valve to open it The lack of voltage at terminals AC1 L LEVEL or H LEVEL indicates that the Controller is not working properly 2 Make sure all wire connections are tight including ground 3 If after this t...

Page 11: ... WHT BLU YEL WATER LEVEL CONTROL WATER LEVEL PROBES GND 6 COMMON 4 L LEVEL 5 H LEVEL 3 AC 2N 1 FILL 2 AC 1L WATER LED L1 N WATER INLET VALVE POWER LIGHT GND GRN POWER SWITCH N L1 ELECTRICAL DIAGRAM ME10G N ME15G N 120 240 VOLTS ...

Reviews: