CECILWARE CORPORATION 

INSTALLATION INSTRUCTION FOR WATER BOILERS

 

Water boilers are shipped with the thermostats in the OFF position. Do not turn the thermostat 
on before filling the water boiler with water. 

NOTE:

 When positioning the unit, leave a minimum  of 6" clearance on the right side of the 

water boiler for ease of service. 

WATER HOOK-UP PROCEDURE:

 

Use ¼” outside diameter copper tubing to connect the unit to the water supply line. The water 
line must have a shut-off valve (supplied by a plumber). At the unit, connect the tubing to the 
compression water inlet valve at the upper right hand side of the unit. 

NOTE:

 Connecting the water boiler to a warm water supply will speed up heating and 

recovery times. 

ELECTRICAL HOOK-UP PROCEDURES:

 

NOTE:

 Always check the rating plate of the unit for proper voltage and current requirements. 

1. 

120V water boilers

 are provided with a 120V/15A grounded plug. Units must have a 

separate 120V/15A outlet. 

2. 

208/240V water boilers

 are provided with a terminal block inside the control box. Field 

wiring must be performed by a qualified serviceman. 

1 and 3 phase hook-up:

 

Remove the fasteners on the cover and slide off cover. Install a suitable conduit and 
connect copper wires to terminal L1 and L2 (and L3 for  3 phase unit only) and  a #14 
AWG ground wire to the ground lug. 

PRIMING AND FILLING A UNIT:

 

Connect unit to power line (plug cord into line for 120V unit or turn on switch for the 208/ 240V 
units). Turn on the water supply. The unit fills at the rate of  1 gallon/minute. When the water 
level becomes visible in the sight gage turn the thermostat clockwise to maximum position. 
The unit will now automatically fill to capacity and heat the water. 

CLEANING INSTRUCTIONS:

 

DAILY:

 Wipe the outside of the unit with a damp cloth, using soap solution or a non-abrasive 

compound when required. 

SANITIZING THE UNIT:

 

With power to the unit disconnected, fill unit to capacity. Add  1 ounce of CLOROX BLEACH 
(5.25%) for every gallon of water in the unit (400 PPM). Let the solution stand in the unit for 15 
minutes, then drain all water from the unit slowly. If the unit is not to be used again 
immediately after sanitizing  — do not rinse with water. If the unit is to be used immediately 
after sanitizing — rinse with water before refilling the unit for further use. 

 

 

 

Summary of Contents for ME-10E

Page 1: ...ter installation This warranty does not apply under the following conditions neglect or abuse of equipment excessive lime condition Improper installation any outside modification to equipment Every Ce...

Page 2: ...o leave at lest 6 on the right side of the water boiler for access to the controls Level the unit by adjusting the bottom pad of the legs Screw the ball float 36 onto the end of the water inlet valve...

Page 3: ...t be performed by a qualified serviceman 1 and 3 phase hook up Remove the fasteners on the cover and slide off cover Install a suitable conduit and connect copper wires to terminal L1 and L2 and L3 fo...

Page 4: ...lary tube 7 Install new thermostat Position capillary end of thermostat bulb two 2 inches from inside wall 8 Tighten large packing nut then small capillary nut DO NOT over tighten since this could dam...

Page 5: ...n Still no reading replace Hi Limit switch Water fails to heat Thermostat Pilot light should be on when thermostat is in the full on position 5 position If not replace thermostat and recalibrate see c...

Page 6: ...phase VOLTS 208 240 50 60 HZ WATTS 7900 10500 AMPS 22 25 PHASE 3 ME10E 15E 120V 208 240 V 1 phase VOLTS 208 240 50 60 HZ WATTS 5300 7000 AMPS 25 5 29 2 PHASE 1 120 Volt Hook Up VOLTS 120 50 60 HZ WAT...

Page 7: ...J11 1 ME 10 15 E WATER BOILER PARTS ILLUSTRATION 7...

Page 8: ...ermometer L007A L007A 34 Stem Valve M0251 M0251 15 Chrome Plated Nut NPT K110A K110A 35 Adapter 20 M0589 M0589 16 Body R479A R480A 36 S S Float 3 M0892 M0892 17 Legs set of 4 M005S M005S 37 Knob M027A...

Reviews: