1. 

HOPPERS:

Depress the door latch on the left

side of the door and pull door open to access
the hoppers.

The hoppers hold up to 4 lbs. (1.8 kg) of

Oatmeal product.
• To remove the hoppers, swing the top
compartment door open and lift out the
hoppers.
• To reposition the hoppers in the
compartment, slide the hopper base back
between the rails until the 1/4" pin at the
bottom of the hopper base falls into the 1/4"
positioning hole of the compartment base
cover.

2.

HEATER SWITCH:

This switch is located inside

the cabinet behind the right hopper; open door
and remove right hopper to access it. 
• Its primary function is to shut off the heating
element during the initial priming, start-up
operation of the machine, or whenever the
tank is being drained for service.

Note: 

The Power Switch and Heater Switch must

be ON in order for the elements to operate.

3.

POWER SWITCH:

This switch is located on the

left side of the splash panel below the door.

Note:

The Power and Heater Switches are

independent of each other. Both switches must
be OFF in order for the machine to be
completely shut down.

4.

WATER LEVEL CONTROLS:

Under normal

conditions and operation, the water level in the
tank should not drop more than 1/2" (1.3cm)
from the probe. If it does, the tank is not
refilling fast enough. Check the water line and
water filter; they may need cleaning or
replacing.
1. Tank Control Board

Part# 

349-00012

2. Water Inlet Valve 

Part# 

L462AL

3. Water Level Sensor

Part# 

K695QL

Start-up Procedure

NOTICE: 

Make sure that the 

Heater Switch

, located

behind right hopper with door opened, is in the 

OFF

position.

1. Connect the 1/4" dia. copper waterline to the

1/4" flare water inlet fitting of the valve.

2. Plug the power cord into a proper receptacle.
3. Activate the Power Switch (Toggle Up). The

door display panel, the red power indicator
light and the green dispense buttons will light
up and the tank will start filling. Allow
approximately 4-5 minutes for the tank to fill.

4. Activate the Heater Switch. Allow

approximately 10-30 minutes for the water to
reach a temperature of 190°F (88°C). The heat
up time will depend on the water inlet
temperature.

5. Place an 8 oz. (240ml) or larger cup under the

left dispense nozzle, press and hold the left
dispense switch for 6 seconds. The machine will
dispense water at the rate of 1 oz. (30ml) per
second. Repeat it several times to check for
consistent output. Repeat same for the other
dispense switches. This procedure checks that
the dispense valves are not air-locked.

6. While the tank is heating, remove the hoppers,

load them with products, and reposition them
back in the machine. When the green ready
light comes on, the tank has reached its brew
temperature and the machine is ready to
dispense the first cup of Oatmeal.

Filling the Hoppers

1. To remove the hoppers, swing the top

compartment door open and lift out the
hoppers.

2. Fill each hopper with the correct product. 
3. Reposition hoppers in the hopper

compartment, making sure the hoppers are
properly seated.

If you need help, call Grindmaster-Cecilware Technical
Service Department, (502) 425-4776 or (800) 695-4500
(USA & Canada only) 8 AM - 6 PM EST.

Prior authorization must be obtained from
Grindmaster-Cecilware for all warranty claims.

4

Cecilware

®

GB Series Oatmeal

Installation (continued)

Summary of Contents for GB3-LPO

Page 1: ...before installing or using the product Properly instruct all operators Keep training records For future reference record serial number here Table of Contents Grindmaster Cecilware 4003 Collins Lane Louisville KY 40245 USA Phone 502 425 4776 Toll Free 800 695 4500 Fax 502 425 4664 Web gmcw com Email info gmcw com 2016 Grindmaster Cecilware Printed in USA 0516 Form CW 325 01 Part 390 00061 Grindmast...

Page 2: ...ne will occur Do not use extension cord NOTICE The appliance is not intended for outdoor use Do not clean with pressurized water or use in an area where pressurized water may be used Cleaning and maintenance shall be made only by properly trained persons with supervision WARNING Safety Information 2 Cecilware GB Series Oatmeal Important Safety Information This is the safety alert symbol It is used...

Page 3: ...he GB oatmeal dispenser is equipped with a Flare Water Inlet fitting which is located on the left side in the back of the base when looking at the machine from the front Water pipe connecting and fixtures directly connected to a potable water supply shall be sized installed and maintained in accordance with Federal State and Local codes HIGHLY RECOMMENDED A WATER SHUT OFF VALVE and A WATER FILTER pr...

Page 4: ...nd right hopper with door opened is in the OFF position 1 Connect the 1 4 dia copper waterline to the 1 4 flare water inlet fitting of the valve 2 Plug the power cord into a proper receptacle 3 Activate the Power Switch Toggle Up The door display panel the red power indicator light and the green dispense buttons will light up and the tank will start filling Allow approximately 4 5 minutes for the tan...

Page 5: ...tat knob turned to full ON position If adjustments should be necessary to increase or decrease the water TEMPERATURE proceed as follows Note Set the Rinse Switch to ON This will disengage the Hopper Motors when dispensing water for Temperature measurements 2 To INCREASE the water temperature With the Thermostat Knob to its maximum clockwise position remove the knob and locate the slotted adjustmen...

Page 6: ...ove front and back auger locks Remove auger Wash rinse sanitize and air dry all small parts Wash scrub hoppers and agitator wheel recesses with bristle brush Rinse sanitize and allow to air dry Reassemble all hoppers Pour powder into hoppers Install all hoppers into unit Sanitizing 1 Prepare a sanitizing solution in accordance with local health department regulations You may also refer to the US F...

Page 7: ... frame assembly inside door 5 The longer metal tab side goes in the front Recommended preventive maintenance 1 Dispense Valves Check all dispense valves for lime build up Drain the water tank to just below the level of the dispense valves Remove the valves and clean Take these valves apart by hand as shown Replace the assembly as needed L467AL 120V or L676AL 230V import Replace the valve into the ...

Page 8: ...w in when the cord is plugged into an electrical outlet the Solenoid coil may be damaged opened or the valve may have an obstruction preventing the water from flowing in Clean or replace it Water Level Controller Test For models manufactured 2015 and prior Check the Controller as follows 1 Make sure there is power input to the Controller at the terminals AC1 AC2 Your voltmeter should read 115 Volts...

Page 9: ...ged Coupling components Water does not shut off Water keeps dispensing Leaking Water Inlet Valve Clean check fittings of Water Inlet Valve Replace Water Inlet Valve if needed See Water Inlet Valve Test Inoperative Dispense Switch Check Switch connections Replace Dispense Switch if needed Inoperative Rinse Switch Check Rinse Switch connections Replace Rinse Switch if inoperative Clogged stuck Water ...

Page 10: ...orization must be obtained from Grindmaster Cecilware for all warranty claims Grindmaster Cecilware provides the industry s BEST warranty Visit our website at GMCW com for warranty terms and conditions Parts List Hopper Parts HOPPER COVER CD106L HOPPER ASS Y CD152L 4 LB 11 5 H x 3 W W WIRE AUGER CD101L AUGER BUSHING FRONT CD277L WIRE AUGER CD101L 22 5Øx18mmPT AGITATOR GEAR CD117 AUGER MOTOR CD175L...

Page 11: ...GB Series Oatmeal Cecilware 11 Parts Diagram and List continued Tank Parts 2 8 GALLON TANK ...

Page 12: ... Parts Grindmaster Cecilware 4003 Collins Lane Louisville KY 40245 USA Phone 502 425 4776 Toll Free 800 695 4500 Fax 502 425 4664 Web gmcw com Email info gmcw com 2016 Grindmaster Cecilware Printed in USA 0516 Form CW 325 01 Part 390 00061 ...

Reviews: