Page 1: ...866 888 6327 sales clevelandequipment com 3889 E Raines Rd Memphis TN 38118 www clevelandequipment com CE 225 Mesh Conveyor Heat Tunnel Operation Manual...

Page 2: ...Packaging Machine Contents I Foreword 1 II Function 1 III Technical Parameters 2 IV Panel 3 V Instructions for Operation 4 VI Electrical Diagram 7 VII Component Diagram 9 VIII Troubleshooting 12 IX S...

Page 3: ...od is a popular and economical packaging method in the packing industry There is an increasing demand for its economical simple packing and aesthetically pleasing appearance The product is wrapped wit...

Page 4: ...2 III Technical Parameters Voltage 220V 50 60Hz Power 7 65 Kw Speed 0 10 m min Tunnel Size 800x400x200 mm 31 5 x 15 75 x 7 9 in Load 5Kg 11 lbs Machine size Low 1060x620x815 mm 41 75 x 24 5 x 32 in Ma...

Page 5: ...of Heating Pipe 3 Conveying Adjustment Adjust speed of conveying motor 4 Conveying Switch Controlling switch of conveying belt motor 5 Heating Switch Switch for controlling heating tube in shrinkage...

Page 6: ...according to the regulations before use and ensure that the contact is good good grounding can reduce the electric shock damage to the human body when a single phase ground fault occurs in the electr...

Page 7: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 5 4 Adjust the heating adjustment know to the appropriate position according to the shrinkage rate of the film...

Page 8: ...conveyor switch and adjust the conveyor know to adjust the conveyor speed to the appropriate gear position 6 After the above operation is completed let the machine run preheat for 5 10 minutes then o...

Page 9: ...e temperature and speed are mutually restrained it may be necessary to repeat the adjustment several times to meet the requirements 8 After the packaging is finished the heating switch should be turne...

Page 10: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 8 VI Electrical Diagram...

Page 11: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 9 VII Component Diagram...

Page 12: ...10 6 Curtain vertical bead 4 1 5 Q235 7 Curtain horizontal strip 2 1 5 Q235 8 Thermal insulation board 2 Group Weldment 9 Upper Liner 1 1 0 Galvanized Sheet 10 Frame 1 Group Weldment 11 Stainless Stee...

Page 13: ...servation Window Partition 1 Group Weldment 26 Observation Window Platform 1 Group Weldment 27 Observation Window Partition 1 Group Weldment 28 Guide Assembly 2 29 Furnace Shield 1 1 0 Galvanized Shee...

Page 14: ...mperature of Tunnel is Low Some heating pipes broken Replace Heat adjustment is too low Increase Temperature is set too low Reset One of the 3 fire wires is loose Re Connect Conveyor Motor Stops Runni...

Page 15: ...at Tunnel Packaging Machine Page 13 IX Shrink Film Temperature Guide Name Thickness mm Heating Time S Temperature C PVC 0 02 0 06 5 10 110 130 PP 0 02 0 04 6 12 130 170 PE 0 06 0 20 10 60 150 180 POF...