11
CDL Maple Sugaring Equipment
P2
BRICKING
19 1-1/4” x 4-1/2” x 9” bricks (OPTIONAL, bricks not included - item 670090217) are required to
fully brick the evaporator. You can order bricks as an add-on to your order or go to your nearest
CDL distributor. Refer to step 5 on page 13 for instructions on bricking.
Once the arch has been bricked, use the rest of the wool to insulate the sides that aren’t
covered by the bricks.
Summary of Contents for HOBBY PRO
Page 6: ...6 CDL Maple Sugaring Equipment ...
Page 7: ...7 CDL Maple Sugaring Equipment STEP 1 ...
Page 8: ...8 CDL Maple Sugaring Equipment STEP 2 ...
Page 9: ...9 CDL Maple Sugaring Equipment STEP 3 ...
Page 12: ...12 CDL Maple Sugaring Equipment STEP 4 Door assembly ...
Page 13: ...13 CDL Maple Sugaring Equipment 1 250 ÉTAPE OPTIONNELLE STEP 5 Bricking ...