17
A. OUTDOOR WALL MOUNT
A1 WITHOUT POWER BOX
①
Disassemble the outdoor flange and dome
housing with wrench. Decide the protocol and ID
code (fig.1), and mount the dome housing as
following.
○
2
Fix the wall bracket and connect it with outdoor
flange with screws and wrench. Tighten the screws
as following.
③
Connect all the cables as required.
④
Mount the Safety Hanging-Lock of the outdoor
flange on the outdoor speed dome. Aim the guide
pin of mounting base at the longest curved chute of
outdoor flange. Fix the speed dome on the outdoor
flange. Tighten the screw as following.
A2WITH POWER BOX(Option
)
①
Disassemble the Outdoor Flange and dome
housing with wrench. Decide the protocol and ID
code(fig.1) and mount the dome housing as
following.
②
Mount the power box on a solid ceiling. Mount
the wall bracket on the power box.
③
Fix the wall bracket to the outdoor flange with
screws and wrench. Tighten the screws as
following.
④
Connect all the cables as required.
⑤
Mount the Safety Hanging-Lock of the outdoor
flange on the outdoor speed dome. Aim the guide
pin of mounting base at the longest curved chute of
outdoor flange. Fix the speed dome on the outdoor
flange. Tighten the screw as following.
B. OUTDOOR CEILING MOUNT(Option
)
①
Disassemble the Outdoor Flange and dome housing with wrench. Decide the protocol and ID code(fig.1), and mount
the dome housing as following.
○
2
Fix the ceiling bracket and connect it with outdoor flange with screws and wrench. Tighten the screws as following.
③
Connect all the cables as required.
④
Mount the Safety Hanging- Lock of the outdoor flange on the outdoor speed dome. Aim the guide pin of mounting
Longest Curved Chute
Guide Pin
Outdoor Flange
Safety Hanging-Lock
Fig. 2
Longest Curved Chute
Guide Pin
Safety Hanging-Lock
Fig. 2
Outdoor Flange