Finished plan
Installation of Awning
step2:
Assemble the head rod and front bar
by using the internal connectors.
step3
:Slide both head rod and front
bar into awning sleeves.
step1:
Identify all parts from
the parts list above. Install
the head rod clamps,
spacing evenly starting 6”
from each end of
window.
step4:
Add the elbows to
the end of front bar, slide the
arms into the side sleeves
and thread into the elbows
step6:
Add the eye ends
on ends of the arms,
straighten the front bar,
making sure the awning is
level and screw the
hinges into wall.
step5
:Attach the head
rod into the head rod clamps
and tighten the wing nuts.
Install one pulley on the
left head rod clamp hook,
install two pulleys on each
hook of the right head
rod clamp (Install the
two pulleys on the
side you want the
pull cord)
step8
:Tie one
end of the thread onto
the left front bar of awning,
thread through left side pulley,
then over closest right side
pulley and down to the cleat
and back up to open right
pulley, then tie end onto the
right front bar, draw all slack in
thread towards cleat and tie
off. (Substitute left for right to
reverse side you wish to
operate from)
step7
:
Install the
tie down cleat on the
left hand side 4-6” below
the awning (when facing
the awning)
CARE and USE
•
Avoid using chemicals to clean your awning. They may damage
UV treatment.
•
Use mild soap and water to clean your awning.
SG03.20
sportsmansguide.com
581816 - CASTLECREEK® 4FT Awning
3 of 3