background image

Finished plan

 

Installation of Awning

step2:

 Assemble the head rod and front bar 

         by using the internal connectors.

step3

:Slide both head rod and front 

       bar into awning sleeves.

step1:

Identify all parts from 

 the parts list above. Install 

     the head rod clamps, 

  spacing evenly starting 6” 

       from each end of 

window.

step4:

Add the elbows to 

the end of front bar, slide the

 arms into the side sleeves 

and thread into the elbows

step6:

Add the eye ends 

on ends of the arms, 

straighten the front bar, 

making sure the awning is 

level and screw the

 hinges into wall.

step5

:Attach the head

rod into the head rod clamps 

and tighten the wing nuts.

Install one pulley on the 

left head rod clamp hook,

install two pulleys on each 

hook of the right head 

rod clamp (Install the 

two pulleys on the 

side you want the 

pull cord)

         step8

:Tie one 

       end of the thread onto 

   the left front bar of awning,

 thread through left side pulley, 

then over closest right side 

pulley and down to the cleat 

and back up to open right 

pulley, then tie end onto the 

right front bar, draw all slack in 

thread towards cleat and tie 

off. (Substitute left for right to 

reverse side you wish to 

operate from) 

step7

Install the 

tie down cleat on the 

left hand side 4-6” below 

the awning (when facing 

the awning)

CARE and USE

Avoid using chemicals to clean your awning.  They may damage 

UV treatment.

Use mild soap and water to clean your awning.

SG03.20

sportsmansguide.com

581816 - CASTLECREEK® 4FT Awning

3 of 3

Reviews: