Underground Scissor Lift QJY3.2-1
7
3.1 Storage
Packed machinery nut always be kept in a covered, protected place, at a temperature between
– 10
℃
and +40
℃
and must not be exposed to direct sunlight.
3.2 Opening the crates
When the crates arrive, check that the machine has not been damaged during transport and that all
parts listed are present. The crates must be opened using all possible precautionary measure to avoid
damaging the machine or its parts. Make sure that parts do not fall from the crate during openin
g.
3.3 Disposal of crates
The wood of the crates may be reused or recycled.
4 Transportation
For transport easily, the PACKAGE are in carton box, and control unit is packed into a wooden box. It
must be moved by suitable capacity forklift truck at the middle of package.
Moving and positioning operation can be very dangerous if not performed with the utmost
caution. Check the integrity and suitability of the available means.
ALL PACKING, LIFTING, HANDLING, TRANSPORT AND UNPACKING ORERATIONS ARE
TO BE PERFORMED EXCLUSIVELY BY EXPERT PERSONNEL WITH KNOWLEDGE OF
THE LIFT AND THE CONTENTS OF THIS MANUAL.
The PACKAGE may be lifted and moved with a lift truck (Fig. 1). If either of the latter two is used, crates
must be hamessed with at least 2 slings.
Fig. 1 Fig. 2
The equipment chosen must be suitable for safe lifting and moving, bearing in mind the dimensions and
weight.