10
[PWD signal]
After plug the AC cord into outlet, VP voltage appears on the base terminal of transistor Q3.
When the VP exceeds 16 volts, Q3 is turned on by the differential voltage between base and
emitter terminal of transistor Q3.
Then the PWD signal goes to GND level and informes “ Power ON “ to the CPU.
When the VP drops less than 16 volts, Q3 is turned off.
Then the PWD goes high level since the PWD is pulled up to VDD.
When the CPU receives “ High “ signal of PWD, CPU goes to “ Power failure process “.
Note : During plug the Ac cord into outlet, all voltages are supplied to the PCB.
If you open the machine for repair, make sure plug off.
[Location for voltage check points]
Actual value on the E259-1 PCB (unitV)
Check point
1
2
3
4
5
6
7
8
9
10
11
12
Power ON
23.8(AC)
31.4
25.2
7.61
24
8.2
8.1
0.6
0
5
5.6
5
Power cord off
0
0
0
0
0
0
0
0
4
0
0
0
10
1
11
8
9
2
3
5
7
12
6
4
Summary of Contents for CE-235
Page 1: ...SERVICE MANUAL ELECTRONIC CASH REGISTER CE 2350 EX 259 JAN 1995...
Page 18: ...8 PCB LAYOUT 16...
Page 19: ...17...
Page 20: ...18...
Page 21: ...19...
Page 22: ...20...
Page 23: ...21...
Page 24: ...22...
Page 25: ...23...
Page 26: ...24...
Page 27: ...25...
Page 28: ...26...
Page 29: ...27...
Page 36: ...34 5 Button block 33 26 32 27 35 34 31 29 36 37 28 25 24 44 40 40 2 42 42 41 23 39 38 30 43 22...
Page 39: ...37 7 Upper case block 55 56 54 52 51 50 57 58 53 49...
Page 42: ...40 9 Printer unit...
Page 44: ...42 10 Drawer unit 10 1 DL 2417 for U S A...
Page 46: ...44 10 2 DL 2351 for Canada...