15
3. Operation Method
After connecting the necessary system devices and installing the software on the PC, perform file
upload/download with the following procedure. On this system each function will be executed if the
IT-2000, which has started up the FLINK Utility, is mounted on the I/O Box after the PC-side utility
was started up. Each function can also be executed by initiating the PC-side utility after mounting
the IT-2000, which has started up the FLINK Utility, on the I/O Box.
3.1 File Upload
Transfer files from the IT-2000 to the PC. There are two methods for specifying the files to be
uploaded: specifying files from the PC, and specifying files from the IT-2000.
3.1.1 Specifying Files from PC
Operation on PC
Start up the Upload/Download Utility on the PC and select "Command" from the "Execute"
menu to display the Command Screen.
Set the Command field to "Receive".
In the "File(s)" field specify the name of the objective file on the PC by its full path name.
In the "Destination Dir" field specify the directory by its full path name on the PC in which the
transmitted file is to be stored.
Fig. 3.1 Command Screen