![cashco POSR-2 Installation, Operation & Maintenance Manual Download Page 3](http://html1.mh-extra.com/html/cashco/posr-2/posr-2_installation-operation-and-maintenance-manual_2567677003.webp)
IOM-POSR-2
3
FIGURE 2
Orientation/Arrangement
POSITION “H”
POSITION “VU”
Pilot valve and main
valve shipped as two
units. Installer to connect
between pilot valve and
main valve for “loading”
and “supply” tubes.
POSITION “VD”
Pipe or tubing installed by customer / installer.
Pipe or tubing installed by Cashco.