CHAPTER
2
P/N 016-5032-164 Rev. A
3
CHAPTER 2
INTRODUCTION
The following instructions are designed to assist with the proper installation of the SC1 HDU system. Refer to the
SC1 Calibration & Operation Manual (P/N 016-4010-005) for assistance with calibrating the software and using the
SC1 HDU system.
PREPARING FOR INSTALLATION
Before installing the SC1 HDU system, park the machine where the ground is level, clean, and dry. Turn off the
machine and leave it turned off for the duration of the installation process.
During the installation process, follow good safety practices. Be sure to carefully read the instructions in this
manual as you complete the installation process.
RECOMMENDATIONS
Raven Industries recommends the following best practices when installing or operating the SC1 HDU system for
the first time, at the start of the season, or when moving the SC1 HDU system to another machine:
• Install the SC1 unit in the recommended location.
• Use part numbers to identify the parts.
• Do not remove the plastic wrap from a part until it is necessary for installation.
• Do not remove plastic caps from a part until it is necessary for installation.
POINT OF REFERENCE
The instructions in this manual assume that you are standing behind the machine, looking toward the cab.