14
STEP 7
1.
Remove the pre-installed screws (pt.I-2) on the Pedal post first.
2.
Attach the Lower handlebar (E-1 R/L) to the left and right pedal post (I-1), and then
close the cover (M-4 & M-5) using screws (pt.P-5 & I-2).
3.
Assemble the Right pedal (pt.M-9) onto the Pedal post (pt. I-3) with 2 Knobs (pt. P-16),
2 Spring washers (pt.P-18),2 Bushings (pt.P-19) and 2 Carriage bolts (pt.P-17).
4.
Assemble the Left pedal (pt.M-6) onto the Pedal post (pt. I-3) with 2 Knob (pt. P-16), 2
Spring washers (pt.P-18),2 Bushings (pt.P-19) and 2 Carriage bolts (pt.P-17).
M5*14
M3*25L
M6*P1.0*40L
M6
4*
2*
4*
1*
Ø
6
Ø7*Ø12*25
E-1