Overview

The GT-G Series Auxiliary Electric Heat mounts internally on
any GT-G upflow (Figure 1) or downflow unit and mounts
directly on the blower outlet of all horizontal GT-G units
(Figure 6).  Note the model compatibility Table 2.  Horizontal
units are rated for zero clearance  at the unit and 1" clearance
for first three feet of duct, vertical units rated for zero clearance
for both unit and duct.  Downflow units can not be located
directly over a discharge register. The discharge plenum must
make a 90

°

 turn after leaving the unit and be constructed from

non combustible material. The GT-G electric heat contains a
four stage relay control board which activates the elements
directly via an internally wired low voltage harness.  Low
voltage  signals (W1 and W2) are staged from the CXM or
DXM control of the GT-G unit.  It should be noted that only
distributor model GT-G units are prewired for low voltage
control of the electric heat.  Carrier Tech Support should
be contacted for use on all other models.

Vertical Upflow or Downflow Installation

1.

Disconnect power to the unit

2.

Remove blower access panels.

3.

Clip wire-tie holding electric heat low voltage 3-wire
harness to discharge panel stiffener.  Refer to Figure 1.

4.

Remove blower mounting screws and then drop down
blower assembly as shown in Figure 2.  Removal of blower
wires should not be necessary.

5.

Install electric heat in discharge flange where blower
assembly has been removed using provided screws as
shown In Figure 3.

AAAAA

AAAAA

AAAAA

AAAAA

AAAAA

AAAAA

AAAAA

Auxiliary  electric heat 

power supply knockout 

opposite air coil

Electric Heat Assembly

Air Coil

Low Voltage control 

harness is prewired 

on all distributor class 

Genesis

Remove screws & 

drop blower

Locate electric heat assembly 

on pins in discharge panel 

and insert screws

Relocate blower in electric 

heat assembly in same 

manner

Figure 2.  Blower removal.

Figure 3.  GT-G electric heat mounting and blower
re-installation.

Figure 1.  Typical vertical unit installation.

Note: For AGM electric heaters remove control box from
houseing by removing the control box cover and then removing
the four (4) screws (do not discard) that hold the control box to
the housing. Allow the control box to hang on the wire tie
located in the housing flange. After completing step 5 replace
the control box on the housing.