
32
REF. DESCRIPTION NO..
1. Power Tray Assembly (W/ AFS) 120V
1A. Power Tray Assembly (W/ AFS) 240V
1B. Power Tray Assembly (W/O AFS)120V
2. High Frequency Power Supply
3. Electronic Air Flow Sensor (Optional)
4. ON/OFF Switch
5. Interlock Switch
6. Cabinet Assembly
7. Pre-Filter (2/ package)
8. Cell, Ionizing-Collecting
9. Ionizing Wire Assembly
10 Front Panel Assembly
11. Contact Board Assembly
12. Charcoal Filter
13. Stepdown Transformer 120V to 24V (0014 & 0020)
13A. Stepdown Transformer 240V to 24V(2020)
14. Insulator (6/ package)
15. Cell Key (not shown)
16. Power Tray Cover
(Full Set / package)
(2/ package)
(optional, not shown)(2/ package)
OWNER RESPONSIBILITIES
The completion and return of the Warranty Registration Card is a condition precedent
to warranty coverage and performance. This warranty is not valid unless the warranty
card is completed and mailed to the factory within fifteen (15) days of equipment
installation.
EACA PARTS LIST
Summary of Contents for EACA 0014
Page 33: ...31 EACA ...