![Carrier AquaForce PUREtec 30XBEZE 200 Installation, Operation And Maintenance Instructions Download Page 10](http://html1.mh-extra.com/html/carrier/aquaforce-puretec-30xbeze-200/aquaforce-puretec-30xbeze-200_installation-operation-and-maintenance-instructions_2562369010.webp)
10
3 - DIMENSIONS, CLEARANCES
3.1 - 30XB(E/P)ZE 0200 to 250
POWER AND
CONTROL
ELECTRICAL BOX
3.2 - 30XB(E/P)ZE 0300 to 400
POWER AND CONTROL
ELECTRICAL BOX
Legend
All dimensions are given in mm.
NOTES:
-Drawings are not contractually binding.
-Refer to unit nameplate for unit weight information
-Before designing an installation, consult the certified
dimensional drawings, provided with the unit (Appedix 4).
-If the installation includes several units or if this (these) is
(are) close to walls, please refer to chapters 3.8 - “Multiple
chiller installation” and 3.9 - “Distance to the wall” of the
installation manual to determine the space required
B
Required clearances for maintenance (see note)
C
Recommended space for evaporator tube removal
D
ATEX zone around the unit
Water inlet for standard unit - for options 100A, 100C, 107 refer to the certified
drawing.
Water outlet for standard unit - for options 100A, 100C, 107 refer to the certified
drawing.
Air outlet – do not obstruct
Power supply and control connection
Slinging points