Carrier Yileng - Shanghai, China
19
Note:
Drawings are not contractually binding. Before designing an installation, consult the certified dimensional
drawings supplied with the unit or available on request.
For the positioning of the fixing points, weight distribution and centre of gravity coordinates please refer to
the dimensional drawings.
3.12 - Multiple chiller installation
NOTE: If the walls are higher than 2 m, contact the factory.