
GB - 5
42HQE009/012/018/022-38YE009/012/018/022
E N G L I S H
Indoor unit installation
1. Pass the piping through the hole in the wall.
2. Put the upper claw at the back of the indoor unit on the upper
hook of the installation plate, move the indoor unit from side
to side to see that it is securely hooked.
3. Piping can easily be made by lifting the indoor unit
B
A
C
Dimensions and Minimum clearances (mm)
Model
42HQE009
42HQE012
42HQE018
42HQE022
A mm
750
815
906
1080
B mm
250
280
286
330
C mm
188
195
235
222
Upper hooker
Low hooker
Cushioning material
Obstacle
with a cushioning material between the indoor unit
and the wall.
Get it out after finish piping.
4. Push the lower part of the indoor unit up on the wall, then move
the indoor unit from side to side, up and down to check if it is
hooked securely.
2000
min.
90 min.
200
min.
100
min.