21
Fig. 46.
Roof installation, method 1
Fig. 47.
Roof installation, method 2
Method 2
• Fix sealing tape to the connection profiles. Drill
160 mm holes with a 10 mm diameter through the
connection profiles. Be sure to remove the drill
boring after drilling.
• Attach the sections to each other using stainles
steel bolts and nuts.
• Seal the seam on the top of the connection pro
-
files.
• Install the cord after sealing.
Summary of Contents for AiroVision 39 HQ
Page 2: ...2 Code No B 8 1 3i Book Publication Date 081018 Revision No 081018 ...
Page 5: ...5 39 HQ Air Handling Units AiroVision Assembly Installation Commissioning Maintenance Manual ...
Page 6: ...6 ...
Page 23: ...23 ...
Page 31: ...31 ...
Page 40: ...40 APPENDIX 1 CELL INFO AND CONNECTION ORDER ...
Page 41: ...41 APPENDIX 2 FRONT WITHDRAWAL FILTER DETAIL ...
Page 42: ...42 APPENDIX 2 FRONT WITHDRAWAL POUCH FILTER INSTALLATION ...
Page 43: ...43 APPENDIX 2 SIDE WITHDRAWAL COMBINED FILTER INSTALLATION ...
Page 44: ...44 APPENDIX 2 SIDE WITHDRAWAL FILTER INSTALLATION F8 F9 ...
Page 45: ...45 APPENDIX 2 SIDE WITHDRAWAL FILTER INSTALLATION F7 ...
Page 46: ...46 APPENDIX 3 1 Side Withdrawal Filter ...
Page 47: ...47 APPENDIX 3 2 Front Withdrawal Filter ...
Page 48: ...48 APPENDIX 3 3 Pleated Filter ...
Page 51: ...51 ...
Page 52: ......