21
Single--Piece Installation
The following steps should be followed for the installation of the single--piece
configuration.
1. Remove cover from Equipment Control Module by pressing the two tabs on
the bottom edge and pulling away. Route wires through large hole in Equip-
ment Control Module. Level Equipment Control Module against wall (for
aesthetic value only -- Equipment Control Module need not be leveled for
proper operation) and mark wall through 4 mounting holes.
2. Drill two 3/16--in. mounting holes in wall where marked. Thermidistat Con-
trol may be mounted to a standard junction box if desired. Hole pattern on
Equipment Control Module matches junction box mounting holes.
3. Secure rear plastic Equipment Control Module to wall with 4 screws and
anchors provided. To avoid unintended bending of wall plate plastic, use all
4 screws and anchors. Make sure all wires extend through hole in Equip-
ment Control Module.
4. Adjust length and routing of each wire to reach proper connector block and
terminal on Equipment Control Module with 1/4--in. (6 mm) extra length.
See Fig. 15.
Summary of Contents for A07048
Page 2: ......
Page 10: ...8 A13295 Fig 2 Coil Excess Wiring A07685 Fig 3 TP PRH A B Carton Contents ...
Page 15: ...13 A07225 Fig 5 Press Tabs to Remove Backplate A07226 Fig 6 Take Apart ...
Page 89: ...87 NOTES ...
Page 90: ...88 NOTES ...
Page 91: ......