T-319
3–8
Table 3–4 Remote Controller Pre-Trip Test Codes
CODE
TITLE
DESCRIPTION
NOTE
The following pre-trip codes perform diagnostic checks on main components of the remote evaporator component
when Code 52 (Cd52) is active. The system must be configured for a Dual Temperature Unit for pre-trip codes to
be activated.
P4-2
Remote Evaporator
Fans On Test
Setup
: Evaporator fans start in the OFF condition, current draw is measured,
then evaporator fans will be turned on. After 60 seconds, the current draw is
measured again. The change in current draw is then recorded.
Pass/Fail Criteria
: Passes if change in current draw is in specified range.
P4-3
Remote Evaporator
Fans Off Test
Setup
: Evaporator fans are turned off. After 10 seconds, the current draw is
measured. The change in current draw is then recorded.
Pass/Fail Criteria
: Passes if change in current draw is in specified range.
P5-6
Remote Evaporator
Fan Direction Test
Setup
: With evaporator fan running on high speed, turn the heaters on for
30 seconds, then measure the temperature difference between the primary
supply and primary return probes.
Pass/Fail Criteria
: Passes if primary supply temperature is 1.0 degrees
higher than primary return temperature. Test P5-0 must pass before this test
is run.
P6-8
Host Liquid Solenoid
Valve (HLSV) Test
Setup
: The system is allowed to run (remote evaporator, condenser and
compressor) for 1 minute with the SMV at 100% and HLSV open. A current
draw test is performed and the values are saved. The HLSV is then closed,
and a 15 second delay follows. A current draw test is again performed and
the values are compared to the original saved values.
Condenser Pressure Control logic should be used for this test if the control-
ler is configured for it. The quench valve, if configured, will operate accord-
ing to normal operating rules.
Pass/Fail Criteria
: Passes if current draw drops below acceptable value.
P6-9
Remote Liquid
Solenoid Valve
(RLSV) Test
Setup
: Once the HLSV pre-trip has completed, open the RLSV and allow
the remote unit to run (remote evaporator, condenser and compressor) for
1 minute with the SMV at 100% and HLSV and host evaporator fans off. A
current draw test is performed and the values are saved. The RLSV is then
closed, and a 15 second delay follows. A current draw test is again per-
formed and the values are compared to the original saved values.
Condenser Pressure Control logic should be used for this test if the control-
ler is configured for it. The quench valve, if configured, will operate accord-
ing to normal operating rules.
Pass/Fail Criteria
: Passes if current draw drops below acceptable value.
P6-10
Remote Suction
Modulation Valve
(RESMV) Close Test
Setup
: Once the RLSV pre-trip has completed, open the RLSV and allow
the remote unit to run (remote evaporator, condenser and compressor) for
1 minute with the SMV at 100% and HLSV and host evaporator fans off. A
current draw test is performed and the values are saved. The RRESMV is
then closed to 1% and a 30 second delay follows. A current draw test is
again performed and the values are compared to the original saved values.
Condenser Pressure Control logic should be used for this test if the control-
ler is configured for it. The quench valve, if configured, will operate accord-
ing to normal operating rules.
Pass/Fail Criteria
: Passes if current draw drops below acceptable value.
Summary of Contents for 69NT40-541-304
Page 2: ......
Page 4: ......
Page 8: ...T 319 iv...
Page 14: ...T 319 1 4...
Page 34: ...T 319 2 20...
Page 48: ...T 319 5 2...
Page 61: ...7 3 T 319 Figure 7 2 Schematic 69NT40 541 304...
Page 62: ...T 319 7 4 Figure 7 3 Unit Wiring Diagram Sheet 1 69NT40 541 304...
Page 63: ...7 5 T 319 Figure 7 4 Unit Wiring Diagram Sheet 2 69NT40 541 304...
Page 64: ...T 319 7 6 Figure 7 5 Legend 69NT40 541 345...
Page 65: ...7 7 T 319 Figure 7 6 Schematic 69NT40 541 345...
Page 66: ...T 319 7 8 Figure 7 7 Unit Wiring Diagram Sheet 1 69NT40 541 345...
Page 67: ...7 9 T 319 Figure 7 8 Unit Wiring Diagram Sheet 2 69NT40 541 345...
Page 68: ...T 319 7 10...
Page 77: ...12 4 T 319...
Page 78: ...T 319 13 1 13 RECEIVER 8 5 17 18 19 20 4 Item 1 4 2 3 6 7 8 6 7 10 9 11 12 13 14 15 16 2...
Page 81: ...14 2 T 319...
Page 84: ...T 319 17 1 17 REMOTE EVAPORATOR FRAME A A A A 4 2 5 6 3 8 9 1 15 11 7 12 10 14 13 2 2 2 9 3 9...
Page 87: ...18 2 T 319...
Page 100: ...T 319 26 2...
Page 104: ...T 319 Index 4...
Page 105: ......