59CU5A: Installation, Start-up, Operating and Service and Maintenance Instructions
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
18
NOTE:
For Upflow Right Side Return, use upflow offset installation for
condensate trap. Refer to
footnotes for other return-air
restrictions.
A200426
Fig. 28 – Upflow Return Air Configurations and Restrictions
A200425
Fig. 29 – Horizontal Return Air Configurations and Restrictions
NOTE:
Refer to
footnotes for other return-air restrictions.
Bottom Return Air Inlet
These furnaces are shipped with bottom closure panel installed in bottom
return-air opening. Remove and discard this panel when bottom return
air is used. To remove bottom closure panel, see
Side Return Air Inlet
These furnaces are shipped with bottom closure panel installed in bottom
return-air opening. This panel MUST be in place when only side return
air is used. Where required by code, seal bottom closure to furnace with
tape, mastic or other durable sealing method.
NOTE:
For allowable side returns in horizontal configurations, see
.
Leveling Legs (If Desired)
In upflow position with side return inlet(s), leveling legs may be used,
see
. Install field-supplied, 5/16 x 1-1/2 in. (8 x 38 mm) (max)
corrosion-resistant machine bolts, washers and nuts.
A89014
Fig. 30 – Leveling Legs
NOTE:
Bottom closure must be used when leveling legs are used. It
may be necessary to remove and reinstall bottom closure panel to install
leveling legs. To remove bottom closure panel, see
.
To install leveling legs:
7. Position furnace on its back. Locate and drill a hole in each bottom
corner of furnace.
8. For each leg, install nut on bolt and then install bolt with nut in
hole. (Install flat washer if desired.)
9. Install another nut on other side of furnace base. (Install flat washer
if desired.)
10. Adjust outside nut to provide desired height, and tighten inside nut
to secure arrangement.
11. Reinstall bottom closure panel if removed.
Horizontal Installation
NOTE:
The furnace must be pitched forward for proper condensate
.
NOT PERMITTED FOR
ANY MODEL
NOTICE
!
Upflow installations utilizing the right side air return
opening should follow the Upflow Specific Steps - Offset
Installation to ensure the full opening is available for return
ductwork.
CAUTION
!
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear
appropriate protective clothing, safety glasses and gloves when
handling parts, and servicing furnaces.
1
3
/
4
1
3
/
4
1
3/
4
1
3/
4
5/
16
5
/
16
5/
16
5/
16
(44mm)
(8mm)
(44mm)
(8mm)
(8mm)
(8mm)
(44mm)
(44mm)