![Carrier 58MEB Installation, Start-Up, And Operating Instructions Manual Download Page 17](http://html.mh-extra.com/html/carrier/58meb/58meb_installation-start-up-and-operating-instructions-manual_2562803017.webp)
-- 17 --
FIRE, INJURY OR DEATH HAZARD
Failure to follow this warning could result in fire, property
damage, personal injury or death.
Do
not
install furnace on its back. Safety control operation
will be adversely affected. Never connect return-air ducts to
back of furnace. (See Fig. 15.)
!
WARNING
FRONT
BACK
FRONT
B
A
C
K
A93043
Fig. 15 -- Installation on Back is Prohibited
A07911
Fig. 16 -- Freeze Protection
UNIT DAMAGE HAZARD
This gas furnace may be used for construction heat
provided that:
-The furnace is permanently installed with all electrical wiring,
piping, air filters, venting and ducting installed according to
these installation instructions. A return air duct is provided,
sealed to the furnace casing, and terminated outside the space
containing the furnace. This prevents a negative pressure
condition as created by the circulating air blower, causing a
flame rollout and/or drawing combustion products into the
structure.
-The furnace is controlled by a thermostat. It may not be “hot
wired” to provide heat continuously to the structure without
thermostatic control.
-Clean outside air is provided for combustion. This is to
minimize the corrosive effects of adhesives, sealers and other
construction materials. It also prevents the entrainment of
drywall dust into combustion air, which can cause fouling and
plugging of furnace components.
-The temperature of the return air to the furnace is maintained
between 55
°
F (13
°
C) and 80
°
F (27
°
C), with no evening
setback or shutdown. The use of the furnace while the
structure is under construction is deemed to be intermittent
operation per our installation instructions.
-The air temperature rise is within the rated rise range on the
furnace rating plate, and the firing rate has been set to the
nameplate value.
-The filters used to clean the circulating air during the
construction process must be either changed or thoroughly
cleaned prior to occupancy.
-The furnace, ductwork and filters are cleaned as necessary to
remove drywall dust and construction debris from all HVAC
system components after construction is completed.
-After construction is complete, verify furnace operating
conditions including ignition, input rate, temperature rise and
venting, according to the manufacturer’s instructions.
CAUTION
!
UNIT DAMAGE HAZARD
Failure to follow this caution may result in minor property or
unit damage.
If furnace is installed in an unconditioned space where the
ambient temperatures may be 32
°
F (0
°
C)or lower, freeze
protection measures must be taken. (See Fig. 16.)
CAUTION
!
Step 2—Furnace Location Relative to Cooling
Equipment
The cooling coil must be installed parallel with or on downstream
side of furnace to avoid condensation in heat exchanger. When
installed parallel with a furnace, dampers or other means used to
control flow of air shall be adequate to prevent chilled air from
entering furnace. If dampers are manually operated, they must be
equipped with a means to prevent operation of either unit, unless
damper is in full-heat or full-cool position.