19. FINISHING INSTALLATION
FINISHING STEPS FOR INSTALLATION
a. Tie together refrigerant piping, drain hose,
electrical connection cords.
Form the refrigerant piping in the required direction
and bind the drain hose, electrical connection cord and
signal line together with vinyl tape.
•
The drain hose should be always at the bottom
of lump to assure smooth drainage.
•
The lump must be of circular shape.
•
Fix piping with pipe clamps and check that any
pipe vibrations cannot be transmitted to the
building structure.
d
. Ensure that the remote control and
control functions are working
properly
b. Fill the gap between the outside wall pipe
hole and the piping with sealing wall
sleeve, wall cap and sealer so that rain and
wind cannot enter.
e
. Adjust the vertical louvers of supply
air for correct air diffusion to the
right or left direction as per the
requirements for the room to be air-
conditioned
c. After completion of electrical wiring to the
indoor unit : Install the window cover of the
terminal block and fixit by using the fixing
screw.
f. Ensure that the air distribution in the
room is uniform by properly
adjusting the air flow direction.
g. After completion of electrical wiring
to the outdoor unit:
•
Fasten the electrical cords with the cable clamp.
•
Install again the service door.
Wall Sleeve
Wall Cap
Sealer Putty
Outdoor side
Wall
Indoor Side
Liquid Line
Drain Hose
Suction
Line
Panel
Window cover
Vertical
Louver