
CONNEC
INSTRUC
TING REF
CTIONS OF
Ex
m
Insulation
RIGERANT
F CONNEC
xcessive tub
must be coil
horizontally
n
T PIPING L
CTIING RE
bing
ed
y
Copper
Piping
26
LINES (Co
EFRIGERA
Whe
insu
area
and
toge
Whe
coile
refrig
coil a
The
verti
oil re
Avoi
conn
to av
r
nt.)
ANT PIPIN
en making
ulation and
a. Using a t
then the in
ether.
n there is
ed horizont
gerant is fr
and toward
excessive
cally since
eturn to th
d disconn
nections af
void refrige
NG LINES
a bend, th
d slides it a
tube bend
nsulation i
excessive
tally so tha
rom the to
ds the out
e tubing m
e the vertic
e compres
necting refr
fter they h
erant leaks
(Cont.)
he installer
away from
er makes
is replaced
e tubing, it
at the flow
op to botto
tdoor unit.
must not be
cal coil aff
ssor.
rigerant pi
have been t
s.
r cuts
the bend
the bend
d gluing it
must be
w of
om of the
e coiled
fects the
iping
tightened
Summary of Contents for 53KHRT 12-18-24 Crystal
Page 54: ...www miraco com eg...