![Carrier 50XZ024 Installation, Start-Up And Service Instructions Manual Download Page 3](http://html.mh-extra.com/html/carrier/50xz024/50xz024_installation-start-up-and-service-instructions-manual_2563361003.webp)
Step 4—Rig and Place Unit
Rigging and handling of this equipment can be hazardous for many
reasons due to the installation location (roofs, elevated structures,
etc.)
Only trained, qualified crane operators and ground support staff
should handle and install this equipment.
When working with this equipment, observe precautions in the
literature, on tags, stickers, and labels attached to the equipment,
and any other safety precautions that might apply.
Follow all applicable safety codes. Wear safety shoes and work
gloves.
INSPECTION
Prior to initial use, and at monthly intervals, all rigging brackets
and straps should be visually inspected for any damage, evidence
of wear, structural deformation, or cracks. Particular attention
should be paid to excessive wear at hoist hooking points and load
support areas. Brackets or straps showing any kind of wear in these
areas must not be used and should be discarded.
Fig. 2—50XZ024-036 Unit Dimensions
UNIT
ELECTRICAL CHARACTERISTICS
UNIT WEIGHT
UNIT HEIGHT
IN. (MM)
”A”
CENTER OF GRAVITY
IN. (MM)
lb
kg
X
Y
Z
50XZ024
208/230-1-60
350
159
39.02 (991.1)
20.0 (508.0)
19.3 (489.0)
17.6 (447.0)
50XZ030
Not Available At This Time
”
”
”
”
”
”
50XZ036
208/230-1-60,208/230-3-60
373
169
41.02 (1041.9)
20.0 (508.0)
14.0 (355.6)
13.0 (330.2)
C00160
Required Clearance for Operation and Service
3