55
The RTU Open controller can be set to communicate on
four different protocols: BACnet, Modbus, N2, and
LonWorks. Switch 3 (SW3) on the board is used to set
protocol and baud rate. Switches 1 and 2 (SW1 and SW2)
are used to set the board’s network address. See Fig. 72
and 73 for protocol switch settings and address switches.
The third party connection to the RTU Open controller is
through plug J19. See Fig. 74 for wiring.
NOTE
: Power must be cycled after changing the SW1--3
switch settings.
Refer to the
RTU Open v3 Integration Guide
for more
detailed information on protocols, third party wiring, and
networking.
Local Access
Wall Mounted Equipment Touch
t
Interface
The Equipment Touch interface is a wall mounted interface
used to connect to the RTU Open controller to access the
control information, read sensor values, and perform
maintenance. This is an accessory interface that does not
come with the RTU Open controller. Wire the Equipment
Touch interface to the RTU Open controller J13 local access
port. There are 2 password protected levels in the display
(User and Admin). See the Equipment Touch Installation
and Setup Guide for more information. See Appendix A in
the guide for navigation and screen content.
SW3 Protocol Selection
PROTOCOL
DS8
DS7
DS6
DS5
DS4
DS3
DS2
DS1
BACnet MS/TP
(Master)
Unused
OFF
OFF
OFF
ON
OFF
Select Baud Select Baud
Modbus
(Slave)
Unused
OFF
OFF
ON
ON
OFF
Select Baud Select Baud
N2
(Slave)
Unused
OFF
OFF
OFF
ON
ON
OFF
OFF
LonWorks
Unused
ON
ON
OFF
ON
OFF
OFF
ON
NOTE:
DS = DIP Switch
BACnet MS/TP SW3 example shown
Baud Rate Selections
BAUD RATE
DS2
DS1
9600
OFF
OFF
19,200
ON
OFF
38,400
OFF
ON
76,800
ON
ON
C07166
Fig. 72 -- RTU Open Controller SW3 DIP Switch Settings
C10815
Fig. 73 -- RTU Open Controller Address Switches
C10816
Fig. 74 -- Network Wiring
Summary of Contents for 50TCQD
Page 5: ...5 C14192 Fig 2 Unit Dimensional Drawing 14 Size Unit ...
Page 6: ...6 C14193 Fig 2 Unit Dimensional Drawing 14 Size Unit cont ...
Page 10: ...10 C10365 Fig 6 Roof Curb Details ...
Page 17: ...17 a50 9707 Fig 26 Typical 50TCQ Control Wiring Diagram ...
Page 18: ...18 a50 9708 Fig 27 Typical 50TCQ Power Wiring Diagram 208 230V 3 Phase 60Hz unit shown ...
Page 43: ...43 a50 9710 Fig 50 PremierLinkt Controller Wiring Schematic ...
Page 51: ...51 a50 9711 Fig 66 RTU Open Controller System Wiring Diagram ...