
38
For damper minimum position settings and checkout menu read
-
ings, see Table 13. See Tables 14-21 for dry bulb and enthalpy se
-
quence of operation.
Table 13 —
Damper Minimum Position Settings and Readings on Checkout Menu
Table 14 —
Dry Bulb Operation, No Demand Controlled Ventilation (DCV) (CO
2
Sensor) — 1 Speed Fan
*With stage 3 delay (STG3 DLY) in Advanced setup menu, second stage
of mechanical cooling Y2-O can be turned on after the delay if the calls for
Y1-I and Y2-I have not been satisfied.
Table 15 —
Dry Bulb Operation, with Demand Controlled Ventilation (DCV) (CO
2
Sensor) — 1 Speed Fan
*With stage 3 delay (STG3 DLY) in Advanced setup menu, second stage
of mechanical cooling Y2-O can be turned on after the delay if the calls for
Y1-I and Y2-I have not been satisfied.
Table 16 —
Enthalpy Operation, No Demand Controlled Ventilation (DCV) (CO
2
Sensor) — 1 Speed Fan
*With stage 3 delay (STG3 DLY) in Advanced setup menu, second stage
of mechanical cooling Y2-O can be turned on after the delay if the calls for
Y1-I and Y2-I have not been satisfied.
DEMAND CONTROLLED VENTILATION
(CO
2
SENSOR)
FAN SPEED
SETPOINTS
CHECKOUT
NO
1
MIN POS
VMAX – HS
N/A
N/A
2
MIN POS H
VMAX – HS
MIN POS L
VMAX – LS
YES
1
VENT MIN
VMIN – HS
VENT MAX
VMAX – HS
2
VENT MIN H
VMIN – HS
VENT MAX H
VMAX – LS
VENT MIN L
N/A
VENT MAX L
N/A
DCV
OUTSIDE AIR
GOOD TO
ECONOMIZE?
Y1-I
Y2-I
FAN SPEED
Y1-O
Y2-O
OCCUPIED
UNOCCUPIED
None
No
Off
Off
High
0-v/Off
0-v/Off
MIN POS
Closed
On
Off
High
24-v/On
0-v/Off
MIN POS
Closed
On
On
High
24-v/On
24-v/On
MIN POS
Closed
Yes
Off
Off
High
0-v/Off
0-v/Off
MIN POS
Closed
On
Off
High
0-v/Off
0-v/Off
MIN POS to Full-Open Closed to Full-Open
On
On
High
24-v/On
24-v/Off* MIN POS to Full-Open Closed to Full-Open
DCV
OUTSIDE AIR
GOOD TO
ECONOMIZE?
Y1-I
Y2-I
FAN SPEED
Y1-O
Y2-O
OCCUPIED
UNOCCUPIED
Below
CO
2
Set
No
Off
Off
High
0-v/Off
0-v/Off
VENTMIN
Closed
On
Off
High
24-v/On
0-v/Off
VENTMIN
Closed
On
On
High
24-v/On
24-v/On
VENTMIN
Closed
Yes
Off
Off
High
0-v/Off
0-v/Off
VENTMIN
Closed
On
Off
High
0-v/Off
0-v/Off
VENTMIN to Full-Open Closed to Full-Open
On
On
High
24-v/On
0-v/Off*
VENTMIN to Full-Open Closed to Full-Open
Above
CO
2
Set
No
Off
Off
High
0-v/Off
0-v/Off
VENTMIN to VENTMAX Closed
On
Off
High
24-v/On
0-v/Off
VENTMIN to VENTMAX Closed
On
On
High
24-v/On
24-v/On
VENTMIN to VENTMAX Closed
Yes
Off
Off
High
0-v/Off
0-v/Off
VENTMIN to VENTMAX Closed
On
Off
High
0-v/Off
0-v/Off
VENTMIN to Full-Open Closed to Full-Open
On
On
High
24-v/On
0-v/Off*
VENTMIN to Full-Open Closed to Full-Open
DCV
OUTSIDE AIR
GOOD TO
ECONOMIZE?
Y1-I
Y2-I
FAN SPEED
Y1-O
Y2-O
OCCUPIED
UNOCCUPIED
None
No
Off
Off
High
0-v/Off
0-v/Off
MIN POS
Closed
On
Off
High
24-v/On
0-v/Off
MIN POS
Closed
On
On
High
24-v/On
24-v/On
MIN POS
Closed
Yes
Off
Off
High
0-v/Off
0-v/Off
MIN POS
Closed
On
Off
High
0-v/Off
0-v/Off
MIN POS to Full-Open Closed to Full-Open
On
On
High
24-v/On
0-v/Off*
MIN POS to Full-Open Closed to Full-Open
Summary of Contents for 50HCQ12
Page 4: ...4 Fig 2 Unit Dimensional Drawing Size 12 Units ...
Page 5: ...5 Fig 2 Unit Dimensional Drawing Size 12 Units cont ...
Page 9: ...9 Fig 6 Roof Curb Details REV 50TM500827 ...
Page 25: ...25 Fig 42 Typical 50HCQ Control Wiring Diagram ...
Page 26: ...26 Fig 43 Typical 50HCQ Power Wiring Diagram 208 230 3 60 unit shown ...
Page 27: ...27 Fig 44 PremierLink Controller Wiring Schematic ...
Page 28: ...28 Fig 45 RTU Open Controller System Wiring Diagram ...