
37
PREMIERLINK
]
CONTROL
C08199
Fig. 44
−
PremierLink
t
Controller
The PremierLink
controller (see Fig. 44) is compatible
with Carrier Comfort Network
(CCN) devices. This
control is designed to allow users the access and ability to
change factory
−
defined settings, thus expanding the
function of the standard unit control board. CCN service
access tools include System Pilot (TM), Touch Pilot (TM)
and Service Tool. (Standard tier display tools Navigator
and Scrolling Marquee are not suitable for use with latest
PremierLink
controller (Version 2.x).)
The PremierLink
control is factory
−
mounted in the
48TC unit’s main control box to the left of the LCTB.
Factory wiring is completed through harnesses connected
to the LCTB thermostat. Field connections are made at a
16
−
pole terminal block (TB1) located on the bottom shelf
of the unit control box in front of the PremierLink
controller The factory
−
installed PremierLink
control
includes the supply
−
air temperature (SAT) sensor. The
outdoor air temperature (OAT) sensor is included in the
FIOP/accessory EconoMi$er 2 package.
Summary of Contents for 48TC 17 Series
Page 39: ...39 C10818 Fig 45 RTU OPEN Control Module ...
Page 83: ...83 APPENDIX IV WIRING DIAGRAMS cont C12616 Fig 74 48TC D17 D28 Power Diagram 208 230 3 60 ...
Page 84: ...84 APPENDIX IV WIRING DIAGRAMS cont C12266 Fig 75 48TC D17 D28 Power Diagram 460 3 60 ...
Page 85: ...85 APPENDIX IV WIRING DIAGRAMS cont C12618 Fig 76 48TC D17 D28 Power Diagram 575 3 60 ...
Page 92: ...92 APPENDIX IV WIRING DIAGRAMS cont C13767 Fig 83 RTU OPEN Wiring Diagram ...
Page 93: ...93 APPENDIX IV WIRING DIAGRAMS cont C13768 Fig 84 RTU OPEN Wiring Diagram with Humidi MiZer ...