
61
Steps
Procedure
Reclaim all refrigerant charge in system.
Cut all line connections to the service valve support;
remove the 2 bolts retaining the liquid valve; remove
the service valve support.
12.Remove Connection Pipe Sub-assy
Reclaim all refrigerant charge in system.
Cut all line connections to 4-way valve and
remove from unit.
10.Remove 4-way valve
11.Remove Service Valve Support
Cut all line connections to the connection pipe
sub-assy; then remove connection pipe sub-assy.
Connection Pipe
Sub-assy
Service Valve Support
4-way valve
Summary of Contents for 38GVM Series
Page 14: ...14 WIRING DIAGRAMS A13093 Fig 12 38GVM 18k Wiring Diagram...
Page 15: ...15 WIRING DIAGRAMS CONTINUED A13094 Fig 13 38GVM 24k Wiring Diagram...
Page 16: ...16 WIRING DIAGRAMS CONTINUED A13095 Fig 14 38GVM 30k Wiring Diagram...
Page 17: ...17 WIRING DIAGRAMS CONTINUED A13096 Fig 15 38GVM 36k Wiring Diagram...
Page 18: ...18 WIRING DIAGRAMS CONTINUED A13097 Fig 16 38GVM 42k Wiring Diagram...