![Carrier 38AUQ 16 Series Installation, Start-Up And Service Instructions Manual Download Page 47](http://html1.mh-extra.com/html/carrier/38auq-16-series/38auq-16-series_installation-start-up-and-service-instructions-manual_2563136047.webp)
47
START UP CHECKLIST
I. PRELIMINARY INFORMATION
OUTDOOR: MODEL NO.
SERIAL NO.
INDOOR:
AIRHANDLER MANUFACTURER
MODEL NO.
SERIAL NO.
ADDITIONAL ACCESSORIES
II. PRE-START-UP
OUTDOOR UNIT
IS THERE ANY SHIPPING DAMAGE?
(Y/N)
IF SO, WHERE:
WILL THIS DAMAGE PREVENT UNIT START-UP?
(Y/N)
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?
(Y/N)
HAS THE GROUND WIRE BEEN CONNECTED?
(Y/N)
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?
(Y/N)
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?
(Y/N)
CONTROLS
ARE THERMOSTAT AND INDOOR FAN CONTROL WIRING CONNECTIONS MADE AND CHECKED?
(Y/N)
ARE ALL WIRING TERMINALS (including main power supply) TIGHT?
(Y/N)
HAS CRANKCASE HEATER BEEN ENERGIZED FOR 24 HOURS?
(Y/N)
INDOOR UNIT
HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?
(Y/N)
ARE PROPER AIR FILTERS IN PLACE?
(Y/N)
HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT?
(Y/N)
DO THE FAN BELTS HAVE PROPER TENSION?
(Y/N)
HAS CORRECT FAN ROTATION BEEN CONFIRMED?
(Y/N)
PIPING
ARE LIQUID LINE SOLENOID VALVES LOCATED AT THE INDOOR COILS AS REQUIRED?
(Y/N)
HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, OUTDOOR AND INDOOR COILS,
TXVs (Thermostatic Expansion Valves), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS
WITH A LEAK DETECTOR?
(Y/N)
LOCATE, REPAIR, AND REPORT ANY LEAKS.
HAVE LIQUID LINE SERVICE VALVES BEEN OPENED?
(Y/N)
HAVE SUCTION SERVICE VALVES BEEN OPENED?
(Y/N)
38A
U
Q
Summary of Contents for 38AUQ 16 Series
Page 4: ...4 C10675 Fig 2 38AUQ 25 Unit Dimensions 38AUQ...
Page 19: ...19 C10784 Fig 16 38AUQ 16 Charging Chart 38AUQ...
Page 20: ...20 C10785 Fig 17 38AUQ 25 Charging Chart 38AUQ...
Page 21: ...21 C10786 Fig 18 38AUQ 16 Power Schematic 208 230 3 60 shown 38AUQ...
Page 22: ...22 C10787 Fig 19 38AUQ 25 Power Schematic 208 230 3 60 shown 38AUQ...
Page 23: ...23 C10788 Fig 20 38AUQ 16 25 Control Schematic 38AUQ...
Page 41: ...41 C10363 Fig 35 Wind Baffles Fabrication 38AUQ...
Page 42: ...42 C10366 Fig 36 15 Ton Wind Baffle Brackets Fabrication 38AUQ...
Page 44: ...44 RIGHT BACK LEFT FRONT C10368 Fig 38 Wind Baffle Installation 20 Ton Units 38AUQ...
Page 45: ...45 38AUQ...