background image

3

INSTALLATION IN 38AKS014-024/INDOOR

FAN COIL (CONSTANT VOLUME)

SPLIT SYSTEM COMBINATION

Step 1 — Install Piping (See Fig. 4)

1. In applications where the air handler refrigerant distribu-

tor is not equipped with a side outlet connection, it is rec-
ommended that a Sporlan in-line auxiliary side connector
with standard distributor be used. Refer to the installation
instructions for the indoor fan coil to obtain nozzle size
and distributor connection size. Select the auxiliary side
connector based on this information. The side connector
must be installed on refrigerant circuit no. 1 (first stage of
cooling) of the fan coil being used.

2. Install a field-supplied

1

/

4

in. NPT to

1

/

4

in. flare fitting on

the gage connection port of the compressor suction
service valve.

3. Sweat the pilot solenoid valve supplied in the hot gas ac-

cessory package

directly

to the hot gas bypass valve on

the

3

/

8

in. ODF external equalizer port.

4. Install field-supplied

1

/

4

in. copper tube (flared with a nut

on each end) between the compressor suction valve and
the hot gas pilot solenoid valve.

5. Connect a field-supplied

5

/

8

in. OD copper tube between

the discharge line process tube (hot gas stub) and a field-
supplied manual shutoff service valve, avoiding any traps
in piping.

6. Connect another field-supplied

5

/

8

in. OD copper tube be-

tween the manual shutoff valve outlet and the hot gas by-
pass valve inlet.

7. Connect a field-supplied

5

/

8

in. OD copper tube between

the leaving side of the hot gas bypass valve and the Sporlan
auxiliary side connector (distributor-side connector).

Shut off all power to the unit and remove refrigerant charge
using an approved refrigerant recovery device before pro-
ceeding with installation. Failure to do so may result for
personal injury.

IMPORTANT: Do not bury refrigerant piping underground.

LEGEND

*Pilot valve connects directly to

bypass valve per sketch A.

TXV —

Thermostatic Expansion
Valve

Fig. 4 — 38AKS Hot Gas Bypass Piping

Summary of Contents for 30GT015-035

Page 1: ...observe pre cautions in the literature and on tags stickers and labels at tached to the equipment Follow all safety codes Wear safety glasses and work gloves Use care in handling equipment INSTALLATION IN 30GT AIR COOLED CHILLERS Step 1 Install Piping See Fig 1 for a schematic of the unit piping BYPASS LINE Install the 5 8 in field supplied line between the factory supplied stubs in the discharge ...

Page 2: ...3 Install Control Wiring Follow all local codes and NEC National Electrical Code U S A when installing control wiring All wire must be a min imum of 16 AWG American Wire Gage U S A Connect control wires as shown in Fig 3 At hot gas sole noid HGS connect to brown and orange wires as shown Be sure all power to the unit is off before proceeding and that all disconnects are open and tagged LEGEND NOTE...

Page 3: ...s bypass valve on the 3 8 in ODF external equalizer port 4 Install field supplied 1 4 in copper tube flared with a nut on each end between the compressor suction valve and the hot gas pilot solenoid valve 5 Connect a field supplied 5 8 in OD copper tube between the discharge line process tube hot gas stub and a field supplied manual shutoff service valve avoiding any traps in piping 6 Connect anot...

Page 4: ...just the setting of the bypass valve a 5 16 in hex wrench is required Remove the cap on the valve and turn the adjustment nut with the hex wrench Turning in a clockwise direction increases the setting and turn ing in a counterclockwise direction decreases the setting Operation The hot gas bypass accessory operates as fol lows When a call for cooling is received the compressor start circuit is ener...

Reviews: