2

Install the field-supplied

1

/

4

in. OD tubing from the SAE

connection to the TXV equalizer line. If the connection is made
directly to the TXV, use the field-supplied, 3-way tee with an
internal branch (install horizontally in the line with the internal
branch attaching directly to the TXV). If the connection is
made into the equalizer line, use the field-supplied, standard 3-
way tee.

Step 2 — Dehydrate and Recharge the Cir-
cuit —

When piping is completed, leak test the assembly and

replace the filter drier cores. Then evacuate, dehydrate, and re-
charge the circuit, using approved refrigeration practices.

Step 3 — Install Control Wiring

Follow all local codes and NEC (National Electrical Code,

U.S.A.) when installing control wiring. All wire must be a min-
imum of 16 AWG (American Wire Gage, U.S.A.).

Connect control wires as shown in Fig. 3. At hot gas sole-

noid (HGS), connect to brown and orange wires as shown.

Be sure all power to the unit is off before proceeding, and
that all disconnects are open and tagged.

LEGEND

NOTE: The bypass valve in this package has

5

/

8

in.

connections and can be used directly on 30GT015-
035 units.

TXV

Thermostatic Expansion Valve
Factory Piping

Field Piping

Fig. 1 — 30GT Piping Schematic

DISCHARGE
STUB
(HIDDEN)

LIQUID
STUB

Fig. 2 — 30GT Stub Locations

Fig. 3 — 30GT Hot Gas Solenoid Wiring

LEGEND

COM —

Common

NC —

Normally Closed

TC —

Temperature Controller

HGS —

Hot Gas Solenoid

NO —

Normally Open

U1

Unloader 1

Summary of Contents for 30GT015-035

Page 1: ...observe pre cautions in the literature and on tags stickers and labels at tached to the equipment Follow all safety codes Wear safety glasses and work gloves Use care in handling equipment INSTALLATION IN 30GT AIR COOLED CHILLERS Step 1 Install Piping See Fig 1 for a schematic of the unit piping BYPASS LINE Install the 5 8 in field supplied line between the factory supplied stubs in the discharge ...

Page 2: ...3 Install Control Wiring Follow all local codes and NEC National Electrical Code U S A when installing control wiring All wire must be a min imum of 16 AWG American Wire Gage U S A Connect control wires as shown in Fig 3 At hot gas sole noid HGS connect to brown and orange wires as shown Be sure all power to the unit is off before proceeding and that all disconnects are open and tagged LEGEND NOTE...

Page 3: ...s bypass valve on the 3 8 in ODF external equalizer port 4 Install field supplied 1 4 in copper tube flared with a nut on each end between the compressor suction valve and the hot gas pilot solenoid valve 5 Connect a field supplied 5 8 in OD copper tube between the discharge line process tube hot gas stub and a field supplied manual shutoff service valve avoiding any traps in piping 6 Connect anot...

Page 4: ...just the setting of the bypass valve a 5 16 in hex wrench is required Remove the cap on the valve and turn the adjustment nut with the hex wrench Turning in a clockwise direction increases the setting and turn ing in a counterclockwise direction decreases the setting Operation The hot gas bypass accessory operates as fol lows When a call for cooling is received the compressor start circuit is ener...

Reviews: