7
(2) No-rust shall be observed on the Chiller.
(3) No-looseness shall be observed at each flange and bolted connections.
(4) No-looseness shall be observed at each Water header flange of the chiller.
(5) There shall be no-liquid leakage from the Chiller.
(6) No-damage shall be observed on all components of the Chiller.
(7) There shall be no-missing of all components of the Chiller.
(8) No-wire-cut shall be observed on electric wiring and piping.