Model 6105 Operations ManualH
Rev M 07-16-182/14/2021
Page 9 of 34
INSTALLATION
Unpacking
This product has been completely tested, cleaned and packed for shipment.
Carefully remove all packing material. Please examine the chamber completely.
Should any damage be found, notify the delivering carrier immediately. Report any
shortages to your local distributor or contact CARON customer service at 740-373-
6809, 800-648-3042 (USA only) or
www.caronproducts.com
.
www.caronproducts.com
Chamber Location
The chamber must be located in a dry, clean, and level area. Allow a 2 inch (51
mm) clearance from the back of chamber for proper air circulation. Locate the
chamber in an area out of direct sunlight and away from heating and cooling ducts.
The figure below shows the exhaust port on the back of the chamber. Install rubber
stopper/vent into port and press in firmly. Make sure vent is in upward position as
shown. If external ducting to a fume hood or exterior vent is necessary, make
connection here. Note that temperature, humidity, and recovery time will be
affected.
Caution: Do not put more than 5 lbs
(2.3kg) on top of unit
Summary of Contents for 6105
Page 1: ......
Page 13: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 13 of 34 ...
Page 15: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 15 of 34 ...
Page 18: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 18 of 34 ...
Page 21: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 21 of 34 ...
Page 24: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 24 of 34 ...
Page 25: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 25 of 34 5 ...
Page 27: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 27 of 34 ...
Page 31: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 31 of 34 Electrical Schematic ...
Page 32: ...Model 6105 Operations ManualH Rev M 07 16 182 14 2021 Page 32 of 34 ...