Caron Measurement & Controls | www.caroncontrols.net
16
S
ECTION
3.4
P
REVENTATIVE MAINTENANCE
T
HE FOLLOWING STEPS SHOULD BE PERFORMED PERIODICALLY TO MAINTAIN
RELIABLE SAMPLER OPERATION
.
O
VER THE FIRST FEW WEEKS
,
CHECK MORE
FREQUENTLY AND TAKE THE TIME DO DEVELOP A MAINTENANCE SCHEDULE
.
1)
C
HECK SAMPLE FILTER ELEMENT
(
IF INSTALLED
).
R
EMEMBER TO
PROPERLY PURGE PUMP AFTER ANYTIME THE SAMPLE LINE IS OPENED
.
2)
V
ERIFY SAMPLE VOLUME CALIBRATION
.
3)
C
HECK TO MAKE SURE SAMPLE TRAY MOVES FREELY
.
4)
C
HECK SAFETY SHUTOFF CALIBRATION
.