Installing the Cistern -
237 002
Inwall Access - masonry wall
Datum
400mm – 420mm
45mm
- Water Supply Connection
NOTE:
90mm Min.
Cavity Depth
720mm
Min.
470mm
(ref)
55mm
(ref)
50mm
335mm to
access panel
centre line
Refer to
specifications
of the selected
urinal.
Service Access Panel
Centre Line (standard mounting)
Installing the Cistern -
237 002
Induct Access
Datum
NOTE: For service duct
access install cistern backwards
with flush pipe rotated 180° and
utilising the Remote Mounting Box
for button installation.
Service Access Box
Front Mount
Service Access Box
Centre Line
(standard mounting)
400mm – 420mm
45mm
- Water Supply Connection
Refer to
specifications
of the selected
urinal.
335mm
to
access panel
centre line
Datum
1.
Calculate the finished floor height
(allowing for floor gradings and tile
thickness, etc.) and add this to the
known height of the selected urinal’s
inlet. Mark this resulting height on
the stud -
This is your datum
and flush pipe centre line.
2.
Fabricate flush pipe using the
Copper Adaptor provided.
3.
Drill suitable diameter hole(s)
through the wall for the flush pipe(s).
4.
Lubricate ‘O’Ring on cistern tail
using soapy water and slide flush
pipe on so that it is protruding in the
opposite direction from that of the
Service Access Box.
5.
Place the flush pipe through hole
and secure cistern to duct wall using 2
screws via holes provided in each of the
mounting brackets.
6.
Connect the water supply.
7.
Remove Dust Cover, turn Isolating
Tap ON, fill tank & set water level using
Adjusting Screw on the inlet valve.
8.
Check cistern and all joints for leaks.
9.
Turn Isolating Tap
OFF
. Continue
with Preparation for Fitout on page 15.
Water Supply Connection
OFF
ON
Dust Cover