TYPICAL INSTALLATION
MOUNTING (New Frame Construction)
TYPICAL INSTALLATION
WIRING
10” ROUND DUCT
10” ROUND
DUCT
7-1/2” x 11-1/4” TO
10” ROUND TRANSITION
MOUNTING
BRACKETS
MOUNTING FRAME
(Built on Site)
CEILING
JOIST
(24” Centers
Shown)
Factory-shipped unit installed in new construction.
10” ROUND
DUCT
10” ROUND
DUCT
FINISHED CEILING
MATERIAL
7-1/2” x 11-1/4” TO
10” ROUND
TRANSITION
7-1/2” x 11-1/4” TO
10” ROUND
TRANSITION
MOUNTING FRAME
(Built On Site)
Factory-shipped unit installed in existing construction.
MOUNTING (Existing Frame Construction)
IMPORTANT:
Remove shipping tape from damper.
Remove the shipping tape from the damper flap and make sure
that damper flap opens and closes freely inside the ductwork.
Use duct tape to make ductwork connections secure and air-tight.
COVER PLATE
WHITE
TO
WHITE
BLACK
TO
BLACK
120 VAC
LINE IN
2
Use U.L. approved connectors to wire per local codes. Connect
ground wire to bottom of conduit box.
DUCTING OPTIONS
BLOWER DISCHARGE POSITIONS
Horizontal discharge position.
(Factory Shipped)
Vertical discharge
position.
DUCT CONNECTOR
(Intake)
DUCT
CONNECTOR
(Intake)
DUCT CONNECTOR
(Discharge)
DUCT
CONNECTOR
(Discharge)
Housing Disassembled and
Rotated To Be Re-Assembled
To Position Shown
FACTORY SHIPPED
MODELS
VCDK040
I
• VCDK050
I
• VCDK070
I