background image

TYPICAL INSTALLATION

MOUNTING (New Frame Construction)

TYPICAL INSTALLATION

WIRING

10” ROUND DUCT

10” ROUND 

DUCT

7-1/2” x 11-1/4” TO
10” ROUND TRANSITION

MOUNTING
BRACKETS

MOUNTING FRAME

(Built on Site)

CEILING

JOIST

(24” Centers

Shown)

Factory-shipped unit installed in new construction.

10” ROUND

DUCT

10” ROUND 
DUCT

FINISHED CEILING

MATERIAL

7-1/2” x 11-1/4” TO

10” ROUND 

TRANSITION

7-1/2” x 11-1/4” TO

10” ROUND 

TRANSITION

MOUNTING FRAME

(Built On Site)

Factory-shipped unit installed in existing construction.

MOUNTING (Existing Frame Construction)

IMPORTANT:

Remove shipping tape from damper.

Remove the shipping tape from the damper flap and make sure
that damper flap opens and closes freely inside the ductwork.
Use duct tape to make ductwork connections secure and air-tight.

COVER PLATE

WHITE

TO

WHITE

BLACK

TO 

BLACK

120 VAC
LINE IN

2

Use U.L. approved connectors to wire per local codes. Connect
ground wire to bottom of conduit box.

DUCTING OPTIONS

BLOWER DISCHARGE POSITIONS

Horizontal discharge position.

(Factory Shipped)

Vertical discharge

position.

DUCT CONNECTOR

(Intake)

DUCT 

CONNECTOR

(Intake)

DUCT CONNECTOR

(Discharge)

DUCT 
CONNECTOR 
(Discharge)

Housing Disassembled and
Rotated To Be Re-Assembled 
To Position Shown

FACTORY SHIPPED

MODELS

VCDK040

I

• VCDK050

I

• VCDK070

I

Reviews: