Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
11
APPLIED INFORMATION (AI) INTEGRATION
INSTALL GUIDE
4.3 Solar Version Only
1. For solar kit versions, there is a length of yellow sensor wire to be routed with the battery harness from
the solar kit to the LED display.
2. Terminate this yellow sensor wire to the Solar positive (+) terminal of the charge controller. Route the
sensor wire down the pole and into the rear enclosure.
3. Once the sensor wire is inside the rear enclosure, connect it to the yellow wire shown below.
To charge
controller
Solar +
To AI FCU
harness solar
sensor wire