background image

8

Instruction manual_DPB01, PPB01 | 06/12/2022 | Copyright © 2022 CARLO GAVAZZI Controls SpA

Warnings

DANGER!

Live parts. Heart attack, burns and other injuries. Disconnect the power supply and load

before installing the device. The device should only be installed by qualified/authorized personnel.

These instructions are an integral part of the product. They should be consulted for all situations
tied to installation and use. They should be kept within easy reach of operators, in a clean place and
in good conditions.

Responsibility for disposal

The product must be disposed of at the relative recycling centres specified by the government or
local public authorities. Correct disposal and recycling will contribute to the prevention of potentially
harmful consequences to the environment and persons.

Service and warranty

In the event of malfunction, fault or for information on the warranty, contact the CARLO GAVAZZI branch or
distributor in your country.

Packaging material

The packing material should be kept for redelivery in case of replacement or repair.

General warnings

- Read carefully the present instruction manual. If the device is used in a manner not specified by the
manufacturer the protection function may be impaired.

- All operations concerning installation, or unmounting, of device or modules shall be carried out by qualified
personnel and after having disconnected all power sources.

- A readily accessible overcurrent protection (fuse or circuit breaker) shall be incorporated in the building
installation wiring.- Read carefully the present instruction manual. If the device is used in a manner not specified
by the manufacturer the protection function may be impaired. - All operations concerning installation, or
unmounting, of device or modules shall be carried out by qualified personnel and after having disconnected all
power sources.

- A readily accessible overcurrent protection (fuse or circuit breaker) shall be incorporated in the building
installation wiring.

UL NOTES

- All the devices shall be installed in a pollution degree 2 environment or better.

- Use 60 or 75°C copper (CU) conductor and wire size No. 30-14 AWG (from 0.06 mm

2

to 2.1 mm

2

), stranded or

solid (DPB01 only).

- Terminal tightening torque of 4.4 Lb-In” (DPB01 only).

- Being these devices Overvoltage Category III they are: “For use in a circuit where devices or system, including
filters or air gaps, are used to control overvoltages at the maximum rated impulse withstand voltage peak of 4.0
kV. Devices or system shall be evaluated using the requirements in the Standard for Transient Voltage Surge
Suppressors, UL 1449 and shall also withstand the available short circuit current in accordance with UL 1449.

- For UL61010 compliance: PPB01 models shall be used with Carlo Gavazzi ZPD11, ZPD11A or ZPD11XA DIN
Rail Sockets

Summary of Contents for DPB01

Page 1: ...DPB01 PPB01 Instruction manual Version 06 12 2022...

Page 2: ...l when present B Information LEDs l Yellow for relay output status l Red for signal alarm status l Green for device ON C DIP switches setting the nominal voltage type of mains power ON delay D Output...

Page 3: ...ect the relay output according to the ratings For DIN rail versions automatic screwdriver can be used with maximum tightening torque 0 5 Nm Keep power OFF while connecting Terminals Power supply DPB01...

Page 4: ...point Overvoltage adjustment dial Typology Linear selection from 2 to 22 Resolution 2 setpoint increase per notch Function Relative undervoltage setpoint Set the desired delay on alarm if required by...

Page 5: ...ue regenerated voltage detection Restore setpoint All phases 85 of the rated value Hysteresis Reaction time 200 ms Hysteresis 2 fixed Delay ON None Delay OFF None Phase sequence alarm Input variables...

Page 6: ...ZI Controls SpA Over under voltage alarms Delay ON Adjustable from 0 1 to 30 s Accuracy from 50 ms at 0 1 s to 5 s at 30 s Repeatability from 10 ms at 0 1 s to 1 s at 30 s Delay OFF None Operating dia...

Page 7: ...DIN rail Hang the device to the DIN rail being sure that the spring closes Use a screwdriver to remove the product as shown in figure Instruction manual_DPB01 PPB01 06 12 2022 Copyright 2022 CARLO GAV...

Page 8: ...or modules shall be carried out by qualified personnel and after having disconnected all power sources A readily accessible overcurrent protection fuse or circuit breaker shall be incorporated in the...

Reviews: