Cargo Floor B.V.
P.O. Box 271
7740 AG COEVORDEN
The Netherlands
Phone: +31 (0)524-59 39 00 www.cargofloor.nl
Fax: +31 (0)524-59 39 99
CF500 cylinder repair regulations, Article No. 9305003
03-09-2008 / GB 23 of 26
If it has not been installed, a choke must be installed.
You can transfer the choke from the disassembled block to the new block. You can also install the new
choke that has been supplied. Ensure that the diameter of the hole agrees with the flow.
Refer to the diagram below to obtain information about the size.
Figure 45.0
Figure 46.0
PB