4.  INSTALLATION

The unit is installed and commissioned as described below; 
please see the Carel “Heos” manual (+0300145EN) for details 
on programming it.

Notice: 

the water and refrigerant connections are located on the 

opposite side to the electrical connections (Fig.4.a):

10

30

11

20 19

Fig. 4.a 

Ref.

Description

11

Water inlet connection: 1” GAS threaded male

10

Water outlet connection: 1” GAS threaded male ( CE vers.) 

20

Refrigerant inlet connection (*)

19

Refrigerant outlet connection (*)

30

Safety valve outlet connection 3/8” GAS threaded male

•  fit appropriately-sized expansion vessels to avoid water hammer from 

damaging the system;

•  install mechanical and/or magnetic filters to minimise the presence of 

impurities in the circuit.

Caution: 

The water connections must always be completed by 

qualified personnel who have the qualifications and authorisations 
required by local regulations, using appropriate personal protective 
equipment (PPE), who are aware of the necessary precautions and who are 
able to correctly and safely complete all required operations.

Caution:

 The PS and TS values for the water circuit connected to the 

HEOS BOX refer to the lowest PS or TS of all the components in the circuit. 
The unit’s water connections have 1” GAS male threads on the CE versions; 
the unit should be connected to the water loop without any reductions 
in diameter, as such reductions may affect the unit’s performance or 

(*): 

the water and refrigerant connections are located on the opposite 

side to the electrical connections, as shown in the figure: the refrigerant 
connections are made using pipe couplings whose diameter and thickness 
varies according to the size of the unit, see “Refrigerant connections”.

4.1  Material supplied

Heos Box is supplied complete with the following material:
•  Assembly and maintenance instructions;
•  Wiring diagram;
•  Safety valve calibration certificate;
•  Carel PSD2 compressor driver technical leaflet;
•  3 temperature probes NTC060HP00;
•  1 temperature probe NTC060HF01;
•  spare fuse kit (described in Tab. 4.a)

Protection description

Quantity 

supplied

Fuse 

model

HB200C0300CE0

HB200C0400CE0

HB200C0600CE0

HB200C1000CE0

Inverter power supply

2

10.3 x 38

20 A gG

20 A gG

32 A gL

25 A gG

Electronic controller power supply

2

10.3 x 38

32 A gL

32 A gL

32 A gL

32 A gL

Digital output 1, 2, 3, 4, 5

5

5 x 20

10 A time lag

10 A time lag

10 A time lag

10 A time lag

Digital output 6

1

5 x 20

12.5 A fast

12.5 A fast

12.5 A fast

12.5 A fast

Refrigerant circuit compartment fan power 
supply

1

10.3 x 38

0.5 A AM

0.5 A AM

0.5 A AM

0.5 A AM

Tab. 4.a 

4.2  Water connections

Refer to Figure 4.a.

Caution:

 before continuing, make sure the unit is powered off, 

placing disconnect switch QS1 and the switch or disconnect device on the 
HEOS BOX power supply line in the OFF position (see the wiring diagram). 
The mains power disconnect device must have a contact opening 
distance that allows complete disconnection in overvoltage category III 
conditions; it must also be incorporated into the HEOS BOX power supply 
line in accordance with national regulations.
To simplify installation and maintenance:
•  install a manual shut-off valve immediately before the water inlet to the 

unit (the valve is not supplied by CAREL);

•  install automatic air vent valves (not supplied by CAREL) in the piping, at 

the highest positions in the circuit;

•  avoid piping layouts in which water may stagnate when the system is 

stopped;

Summary of Contents for HB200C0300CE0

Page 1: ...C o n t r o l S o l u t i o n s E n e r g y S a v i n g s NO POWER SIGNAL CABLES TOGETHER READ CAREFULLY IN THE TEXT HEOS BOX R744 User manual Assembly instructions including user and maintenance inf...

Page 2: ......

Page 3: ...uit 12 2 11 Electrical panel 13 2 12 Requirements for positioning the unit and multi evaporator layout 14 3 HANDLING 19 3 1 Opening the packaging 19 3 2 Positioning the unit 19 4 INSTALLATION 21 4 1 M...

Page 4: ......

Page 5: ...EQUIPMENT HAZARD The unit is supplied sealed with an inert gas nitrogen pre charge of around 1 bar 14 5 psi above atmospheric pressure Take all necessary precautions to avoid material from being expe...

Page 6: ...equivalent new equipment on a one to one basis or one to zero for equipment less than 25 cm on their longest side 3 the equipment may contain hazardous substances the improper use or incorrect dispos...

Page 7: ...d with a Carel unipolar electronic expansion valve which is not supplied with the unit Appropriate sizing of the electronic valve where possible using Carel s selection tools allows Heosbox to be used...

Page 8: ...configuration HBOPZGATY2000 Kit for supervisor WiFi connection HBOPZRAHY2000 Anti sweat heater management kit Tab 2 d 2 5 Connection diagrams local and su pervisor connection The Heosbox unit can be c...

Page 9: ...y and therefore an external switch is needed for connection to the supervisory system Ethernet network Modbus Ethernet switch Fig 2 e On request a version of the controller with two Ethernet ports is...

Page 10: ...edium temperature operation Evaporating temperature 10 C superheat 10 K subcooling 0 K condensing temperature 20 C compressor rotation speed 80 rps 4 Nominal conditions for low temperature operation E...

Page 11: ...ulation of the current supplied by the electronic control does not include the optional anti sweat heater kit In fact the optional kit is not powered by the electronic controller but by the Heos Box m...

Page 12: ...nser Water outlet connection Water inlet connection Suction pressure line Discharge Line Fig 2 h 2 26 30 29 1 14 15 8 12 13 25 22 6 17 16 23 24 4 9 10 11 27 19 18 7 20 28 21 5 3 Fig 2 i Ref Descriptio...

Page 13: ...earth wire connection 43 Anti sweat heater kit 44 Electrical panel main switch 45 Electric panel ventilation air intake grille 46 Electrical panel power cable gland 47 Cable gland for digital output 6...

Page 14: ...other acceptable configuration involves a common liquid line NB the last evaporator also needs to be well supplied with liquid and the suction lines in a multisplit arrangement Multiplex configuration...

Page 15: ...ox Fig 2 p Heos Box lower than the evaporator P trap Reverse trap Suction line Heosbox Fig 2 q Possible oil top up Caution refer to section 4 6 2 12 3 Evaporator combination requirements When sizing t...

Page 16: ...6 0 755 1 319 2 304 3 634 5 154 7 002 11 464 25 0 271 0 692 1 209 2 113 3 333 4 727 6 422 10 514 Tab 2 p MT application medium temperature Minimum cooling capacity in kW to ensure the oil is carried t...

Page 17: ...ling capacity needed to carry the oil The tables below show the minimum cooling capacity as a function of Operating conditions Pipe diameter For the optimum diameter make sure that the required design...

Page 18: ...420 5 395 7 652 10 396 17 020 20 0 409 1 043 1 821 3 181 5 019 7 117 9 670 15 831 25 0 375 0 956 1 670 2 917 4 602 6 526 8 867 14 516 Tab 2 w Minimum cooling capacity in kW to ensure the oil is carrie...

Page 19: ...installed on the floor observing the clearances and making sure that there is natural ventilation to the unit Always avoid positioning installing the unit outdoors in a place where it is exposed to t...

Page 20: ...ed for correct operation of the unit the following images show the distances from the surfaces to be allowed for during installation Side view Top view wall wall MIN 150 mm 5 91 in MIN 150 mm 5 91 in...

Page 21: ...e using pipe couplings whose diameter and thickness varies according to the size of the unit see Refrigerant connections 4 1 Material supplied Heos Box is supplied complete with the following material...

Page 22: ...ff placing disconnect switch QS1 and the switch or disconnect device on the HEOS BOX power supply line in the OFF position see the wiring diagram The mains power disconnect device must have a contact...

Page 23: ...o the HEOS BOX power supply line in accordance with national regulations It is compulsory to follow the instructions on the wiring diagrams and comply with the minimum sizes of the multi core cables s...

Page 24: ...gerant into the unit and are not technical specifications The expansion valves on the units must be correctly sized in order to complete the charging operation successfully CAREL Industries S p A may...

Page 25: ...n 30 minutes 10 Disconnect the pump and close the discharge pressure port Fig 2 i 3 11 Carefully open the refrigerant inlet and outlet shut off valves Fig 2 i 18 and 21 4 8 2 Multi evaporator ME Cauti...

Page 26: ...the Electrical Connections have been carried out as described in paragraph 4 4 4 Make sure that there is at least one display kit available see paragraph 2 3 If wanting to use the interface via smart...

Page 27: ...outside of the unit Maintenance operations to be carried out every six months visually inspect the inside of the box every six months It is forbidden to remove the outer protection panels without firs...

Page 28: ...l output 5 5 Free cable gland 1 17 Cable gland for digital output 6 6 Free cable gland 2 18 Heos electronic controller fuses 7 Free cable gland 3 19 Auxiliary terminals for optional anti sweat heater...

Page 29: ...Now connect the wires downstream of the kit marked 08 and 09 to terminal J25 as shown on page QE EFS 7 of the panel s wiring diagram using a flat head screwdriver to help lever the spring When connect...

Page 30: ...30 ENG Heos BOX R704 0300140EN rel 1 0 25 05 2022 Notes...

Page 31: ......

Page 32: ...BEL Caution Do not remove this copy of the unit label from the manual The customer is required to carefully keep all of the documentation supplied with the unit for any future maintenance or service U...

Reviews: